Prelude FLNG Won't Restart in 2020

Sonali Paul
Friday, October 16, 2020

Royal Dutch Shell said on Thursday its Prelude floating liquefied natural gas (FLNG) project off Australia, off line since early February, is working on restarting operations but would not resume full production this year. 

The troubled Prelude FLNG platform was shut down following an electrical trip and Shell has faced a number of issues over the past few months in trying to restart full production and now does not expect to ship any LNG before next year.

Full production is not expected to resume before year-end. Prelude is a multi-decade project, and our focus is on delivering sustained performance over the long term,” Shell said in a statement.

The company hopes to resume shipping LNG from Prelude in the first quarter of 2021, a person familiar with the situation said.

The $17 billion Prelude project, centered around the world’s biggest floating liquefaction vessel, has been plagued with problems. It shipped its first cargo only last year, more than two years behind schedule, and has yet to achieve steady output at its design capacity of 3.6 million tonnes a year of LNG.

The project is jointly owned by Shell, Japan's Inpex Corp, Korea Gas Corp, and a unit of Taiwan's CPC Corp.

(Reporting by Sonali Paul; Editing by Richard Pullin and Christian Schmollinger)

Categories: Offshore Energy LNG Industry News Activity Floating Production FLNG Australia/NZ

Related Stories

BP Greenlights $7B CCUS Scheme Tied to Indonesia LNG Facility

TotalEnergies Inks 15-Year LNG Supply Deal with China’s Sinopec

TotalEnergies Signs LNG Supply Deal with South Korea’s HD Hyundai Chemical

Santos Pens Mid-Term LNG Supply Deal

DOF Subsea Grows Its APAC Backlog

Indonesia Green Lights Eni Gas Projects

"World's Most Powerful Floating Wind Turbine" Sets Sail

Jadestone Energy Secures Four Shallow Water Fields Offshore Malaysia

China’s CNOOC Hits ‘High Yield’ Well in in Beibu Gulf

South Korea's KOMIPO Cancels Plans for LNG Import Terminal

Current News

Velesto Completes Removal of Wrecked Naga 7 Jack-Up Rig Off Malaysia

BP Greenlights $7B CCUS Scheme Tied to Indonesia LNG Facility

Sapura Scoops Petrobras Contract for Pan-Malaysia Offshore Services

Velesto’s Drilling Rigs Up for Automatization Overhaul Under New Tech Alliance

US Firm Finds Chinese Partner to Deliver Mobile Offshore Drilling Units

TotalEnergies and Oil India to Jointly Tackle Methane Emissions Issues

Keppel Reclaiming Control of 13 Rigs to Cash In on Offshore Drilling Market's Growth

Global Offshore Wind Stumbles to the End of '24

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Malaysia's FPSO Firm Bumi Armada Eyes Merger with MISC’s Offshore Unit

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com