LogIn LogOut

CDWE Wraps Up Pin Pile Installation Job for Taiwanese Offshore Wind Farm

June 3, 2025

(Credit: CDWE)
(Credit: CDWE)

CDWE, a joint venture between CSBC Corporation and DEME Offshore, has completed the installation of pin piles for the Hai Long offshore wind farm, being built in Taiwan.

A total of 219 pin piles have been installed using the Green Jade heavy lift vessel, paving the way for the upcoming jacket foundation installation campaign.

Hai Long project exceeds 1 GW and consists of Hai Long 2 and Hai Long 3 wind farms, spanning three sites in the Taiwan Strait 45-70 kilometers off the coast and is jointly developed by Mitsui & Co, Northland Power, and Gentari.

Hai Long is will feature 73 Siemens Gamesa's flagship wind turbines SG 14-222 DD, each rated at 14 MW.

Hai Long 2 is scheduled to be completed by the end of 2025, with Hai Long 3 set for completion in 2026.

“A huge thank you to our amazing Green Jade and CDWE project team, along with our client, auxiliary fleet, subcontractors, and suppliers. Together, we’re driving progress and creating a greener future as part of Taiwan’s sustainable energy vision,” CDWE said on social media.

Current News

Chuditch Gas Field Drilling Ops Get Delayed to Next Year

Chuditch Gas Field Drilling Ops Get Delayed to Next Year

French Oil Major Acquires Interests in Multiple Blocks in Southeast Asia

French Oil Major Acquires Interests in Multiple Blocks in Southeast Asia

Fugro Expands Geotechnical Testing Capabilities in Indonesia

Fugro Expands Geotechnical Testing Capabilities in Indonesia

UK Firm Secures Exploration Extension for Two Blocks off Vietnam

UK Firm Secures Exploration Extension for Two Blocks off Vietnam

ABL Lands Work on BP’s Indonesian Gas and CCUS Project

ABL Lands Work on BP’s Indonesian Gas and CCUS Project

CNOOC Starts Production at Offshore Field in South China Sea

CNOOC Starts Production at Offshore Field in South China Sea

MODEC, Carbon Clean to Advance FPSO-Mounted Carbon Capture Tech

MODEC, Carbon Clean to Advance FPSO-Mounted Carbon Capture Tech

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com