LogIn LogOut

MODEC Gets Shell’s Gato do Mato FPSO Ops and Maintenance Job

March 25, 2025

Illustration (Credit: MODEC)
Illustration (Credit: MODEC)

MODEC has signed an agreement with Shell for the operations and maintenance of the floating production, storage and offloading (FPSO) vessel, to be deployed at Gato do Mato deepwater field off Brazil, for a period of 20 years.

The agreement follows the execution of the Front-End Engineering Design (FEED) contract, which was awarded to MODEC in March 2024, and final investment decision (FID) for the project made by Shell Brasil Petróleo, a subsidiary of Shell, earlier in March 2025.

When installed, FPSO Gato do Mato will be capable of producing 120,000 barrels of oil per day (BOPD), as well as associated gas and water, and will be moored at a water depth of approximately 2,000 m, around 200 km South of Rio de Janeiro.

MODEC will be responsible for the design of the hull and all related topsides facilities for the FPSO, which will be moored by a SOFEC Spread Mooring system.

The produced stabilized crude will be stored in the FPSO tanks, and the oil will be offloaded to shuttle tankers to go to market.

The FPSO will feature a new built, custom-made Next Generation Hull to meet the 25-year design life.

The FPSO Gato do Mato will be the 19th FPSO to be developed by MODEC for Brazil. It will be the second unit to be delivered directly to Shell by MODEC for operation in Brazil.

Located in the Santos Basin, the Gato do Mato project is a pre-salt gas-condensate discovery that covers two contiguous blocks - BM-S-54, a concession contract entered into in 2005, and Sul de Gato do Mato, a production sharing agreement obtained in 2017.

Initial operations will involve the reinjection of natural gas for reservoir pressure support, with future optionality to export gas to onshore facilities.

The Gato do Mato Consortium includes Shell (operator with a 50% stake), Ecopetrol (30%), TotalEnergies (20%) and Pré-Sal Petróleo (PPSA) acting as the manager of the production sharing contract (PSC).

The consortium expects that the Gato do Mato field will start operations in 2029.


Current News

Sapura Energy Nets $22.6M in Offshore Support Vessel Contracts

Sapura Energy Nets $22.6M in Offshore Support Vessel Contracts

CNOOC Puts Into Production New Oil Field in South China Sea

CNOOC Puts Into Production New Oil Field in South China Sea

Sunda Energy Starts Environmental Consultation for Chuditch-2 Well Drilling Plans

Sunda Energy Starts Environmental Consultation for Chuditch-2 Well Drilling Plans

Pakistan’s OGDC to Start Production at ADNOC’s Offshore Block by 2027

Pakistan’s OGDC to Start Production at ADNOC’s Offshore Block by 2027

Petrovietnam, Petronas Extend PSC for Offshore Block

Petrovietnam, Petronas Extend PSC for Offshore Block

Sapura Energy Scoops Close to $9M for O&M Work off Malaysia

Sapura Energy Scoops Close to $9M for O&M Work off Malaysia

Hanwha Ocean Marks Entry into Deepwater Drilling Market with First Drillship

Hanwha Ocean Marks Entry into Deepwater Drilling Market with First Drillship

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

HSBC lowers Brent forecasts due to trade tensions and sluggish demand for oil
Stellantis Chairman: US tariffs and EU rules put auto industry at risk
Austrian banker loses battle against extradition to US for money laundering charges
https://accounts.newwavemedia.com