MODEC Gets Shell’s Gato do Mato FPSO Ops and Maintenance Job

Tuesday, March 25, 2025

MODEC has signed an agreement with Shell for the operations and maintenance of the floating production, storage and offloading (FPSO) vessel, to be deployed at Gato do Mato deepwater field off Brazil, for a period of 20 years.

The agreement follows the execution of the Front-End Engineering Design (FEED) contract, which was awarded to MODEC in March 2024, and final investment decision (FID) for the project made by Shell Brasil Petróleo, a subsidiary of Shell, earlier in March 2025.

When installed, FPSO Gato do Mato will be capable of producing 120,000 barrels of oil per day (BOPD), as well as associated gas and water, and will be moored at a water depth of approximately 2,000 m, around 200 km South of Rio de Janeiro.

MODEC will be responsible for the design of the hull and all related topsides facilities for the FPSO, which will be moored by a SOFEC Spread Mooring system.

The produced stabilized crude will be stored in the FPSO tanks, and the oil will be offloaded to shuttle tankers to go to market.

The FPSO will feature a new built, custom-made Next Generation Hull to meet the 25-year design life.

The FPSO Gato do Mato will be the 19th FPSO to be developed by MODEC for Brazil. It will be the second unit to be delivered directly to Shell by MODEC for operation in Brazil.

Located in the Santos Basin, the Gato do Mato project is a pre-salt gas-condensate discovery that covers two contiguous blocks - BM-S-54, a concession contract entered into in 2005, and Sul de Gato do Mato, a production sharing agreement obtained in 2017.

Initial operations will involve the reinjection of natural gas for reservoir pressure support, with future optionality to export gas to onshore facilities.

The Gato do Mato Consortium includes Shell (operator with a 50% stake), Ecopetrol (30%), TotalEnergies (20%) and Pré-Sal Petróleo (PPSA) acting as the manager of the production sharing contract (PSC).

The consortium expects that the Gato do Mato field will start operations in 2029.


Categories: Vessels Industry News Activity South America Oil and Gas FPSOs

Related Stories

EnQuest Set to Top 2025 Production Forecast on Southeast Asia Gains

TotalEnergies Sells Stake in Malaysia’s Block to Thailand’s PTTEP

Eni Makes Significant Gas Discovery Offshore Indonesia

Petronas Enlists MISC for FPU Job at Gas Field Offshore Brunei

Japan’s JERA Signs First Long-Term LNG Deal with India’s Torrent Power

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

CNOOC Puts New South China Sea Development Into Production Mode

Seatrium Maintains $12.8B Order Book on Renewables and FPSO Progress

Yinson Production Nets DNV Approval for New FPSO Hull Design

Hanwha Ocean's Tidal Action Drillship Starts Maiden Job with Petrobras

Current News

Fugro Nets Mubadala Energy’s Deepwater Gas Job in Asia

EnQuest Set to Top 2025 Production Forecast on Southeast Asia Gains

Velesto Agrees $63M Jack-Up Drilling Rig Sale with Indonesian Firm

TotalEnergies Sells Stake in Malaysia’s Block to Thailand’s PTTEP

Technip Energies Gets On Board Thailand’s First CCS Project

Eni Makes Significant Gas Discovery Offshore Indonesia

Petronas Enlists MISC for FPU Job at Gas Field Offshore Brunei

Japan’s JERA Signs First Long-Term LNG Deal with India’s Torrent Power

India's ONGC Set to Retain 20% stake in Russia's Sakhalin-1 Project

Harbour Energy to Sell Stakes in Indonesian Assets to Prime Group for $215M

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com