MODEC Gets Shell’s Gato do Mato FPSO Ops and Maintenance Job

Tuesday, March 25, 2025

MODEC has signed an agreement with Shell for the operations and maintenance of the floating production, storage and offloading (FPSO) vessel, to be deployed at Gato do Mato deepwater field off Brazil, for a period of 20 years.

The agreement follows the execution of the Front-End Engineering Design (FEED) contract, which was awarded to MODEC in March 2024, and final investment decision (FID) for the project made by Shell Brasil Petróleo, a subsidiary of Shell, earlier in March 2025.

When installed, FPSO Gato do Mato will be capable of producing 120,000 barrels of oil per day (BOPD), as well as associated gas and water, and will be moored at a water depth of approximately 2,000 m, around 200 km South of Rio de Janeiro.

MODEC will be responsible for the design of the hull and all related topsides facilities for the FPSO, which will be moored by a SOFEC Spread Mooring system.

The produced stabilized crude will be stored in the FPSO tanks, and the oil will be offloaded to shuttle tankers to go to market.

The FPSO will feature a new built, custom-made Next Generation Hull to meet the 25-year design life.

The FPSO Gato do Mato will be the 19th FPSO to be developed by MODEC for Brazil. It will be the second unit to be delivered directly to Shell by MODEC for operation in Brazil.

Located in the Santos Basin, the Gato do Mato project is a pre-salt gas-condensate discovery that covers two contiguous blocks - BM-S-54, a concession contract entered into in 2005, and Sul de Gato do Mato, a production sharing agreement obtained in 2017.

Initial operations will involve the reinjection of natural gas for reservoir pressure support, with future optionality to export gas to onshore facilities.

The Gato do Mato Consortium includes Shell (operator with a 50% stake), Ecopetrol (30%), TotalEnergies (20%) and Pré-Sal Petróleo (PPSA) acting as the manager of the production sharing contract (PSC).

The consortium expects that the Gato do Mato field will start operations in 2029.


Categories: Vessels Industry News Activity South America Oil and Gas FPSOs

Related Stories

MODEC, Sumitomo Partner Up for Delivery of Gato do Mato FPSO

Hanwha Drilling’s Tidal Action Drillship En Route to Petrobras’ Roncador Field

MODEC Wins ExxonMobil Guyana’s Hammerhead FPSO Contract

Sapura Energy Nets $22.6M in Offshore Support Vessel Contracts

CNOOC Sees 11% Profit Growth in 2024 Driven by Record Oil Production

Marine Masters Secures Wellhead Platforms Installation Job Off India

Shell Predicts 60% Rise in LNG Demand by 2040 with Asia Leading the Way

ONE Guyana FPSO En Route to ExxonMobil’s Yellowtail Field

ONGC and BP Sign Deal to Boost Production at India's Largest Offshore Oil Field

CNOOC Boosts Dongfang Gas Fields Output with New Platform Coming Online

Current News

Shell-Reliance-ONGC JV Complete India’s First Offshore Decom Project

The Future of Long-Idle Drillships: Cold-Stacked or Dead-Stacked?

TMC Books Compressors Orders for FPSO and LNG Vessels

MODEC, Sumitomo Partner Up for Delivery of Gato do Mato FPSO

Chuditch Gas Field Up for Summer Drilling Ops as Sunda Reshapes Ownership Structure

EnQuest Bags Two Production Sharing Contracts off Indonesia

Hanwha Drilling’s Tidal Action Drillship En Route to Petrobras’ Roncador Field

China's ENN, Zhenhua Oil Ink LNG Supply Deals with ADNOC

MODEC Wins ExxonMobil Guyana’s Hammerhead FPSO Contract

India Stretches Bids Deadline for 13 Offshore Deep-Sea Mineral Blocks

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com