MODEC Gets Shell’s Gato do Mato FPSO Ops and Maintenance Job

Tuesday, March 25, 2025

MODEC has signed an agreement with Shell for the operations and maintenance of the floating production, storage and offloading (FPSO) vessel, to be deployed at Gato do Mato deepwater field off Brazil, for a period of 20 years.

The agreement follows the execution of the Front-End Engineering Design (FEED) contract, which was awarded to MODEC in March 2024, and final investment decision (FID) for the project made by Shell Brasil Petróleo, a subsidiary of Shell, earlier in March 2025.

When installed, FPSO Gato do Mato will be capable of producing 120,000 barrels of oil per day (BOPD), as well as associated gas and water, and will be moored at a water depth of approximately 2,000 m, around 200 km South of Rio de Janeiro.

MODEC will be responsible for the design of the hull and all related topsides facilities for the FPSO, which will be moored by a SOFEC Spread Mooring system.

The produced stabilized crude will be stored in the FPSO tanks, and the oil will be offloaded to shuttle tankers to go to market.

The FPSO will feature a new built, custom-made Next Generation Hull to meet the 25-year design life.

The FPSO Gato do Mato will be the 19th FPSO to be developed by MODEC for Brazil. It will be the second unit to be delivered directly to Shell by MODEC for operation in Brazil.

Located in the Santos Basin, the Gato do Mato project is a pre-salt gas-condensate discovery that covers two contiguous blocks - BM-S-54, a concession contract entered into in 2005, and Sul de Gato do Mato, a production sharing agreement obtained in 2017.

Initial operations will involve the reinjection of natural gas for reservoir pressure support, with future optionality to export gas to onshore facilities.

The Gato do Mato Consortium includes Shell (operator with a 50% stake), Ecopetrol (30%), TotalEnergies (20%) and Pré-Sal Petróleo (PPSA) acting as the manager of the production sharing contract (PSC).

The consortium expects that the Gato do Mato field will start operations in 2029.


Categories: Vessels Industry News Activity South America Oil and Gas FPSOs

Related Stories

Qatar LNG Exports Cut 17% After Missile Strikes, $20B Revenue Loss Expected

IEA Weighs Further Oil Stock Releases as War on Iran Continues

ADNOC Gas Adjusts LNG Output Amid Hormuz Disruptions

Petronas Makes New Hydrocarbon Discovery in Southeast Asia

Aramco Warns of Severe Oil Market Fallout from Hormuz Blockade

Valeura Lifts Output with Three Producing Wells at Thailand’s Manora Field

China’s Five-Year Plan Focuses on Oil Stability, Gas and Reserves Growth

Petronas Picks OceanSTAR Elite FPSO for Asian Oil and Gas Project

Velesto Inks Five-Year Drilling Deal for Jack-Up Rig with Petronas

MODEC, Eld Energy Partnership Targets Low-Carbon FPSO Power

Current News

CNOOC Names New CEO

Qatar LNG Exports Cut 17% After Missile Strikes, $20B Revenue Loss Expected

China’s Sinopec Plans to Skip Iranian Oil, Tap Strategic State Reserves

IEA Weighs Further Oil Stock Releases as War on Iran Continues

ADNOC Gas Adjusts LNG Output Amid Hormuz Disruptions

US Oil Shield Starts Showing Cracks as Iran War Drives Prices Higher

US to Deploy Amphibious Assault Ship, Marines to Middle East

Indian Gas Tankers Prepare to Sail Through Strait of Hormuz

Offshore Vietnam: Energy Imports Rise as Domestic Production Falls

Eni Advances Major Deep Water Gas Hubs with Dual FIDs

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com