Wood Secures Subsea Design Scope on QatarEnergy’s Bul Hanine Redevelopment

Thursday, May 21, 2026

Wood has secured a contract by China Offshore Oil Engineering Company (COOEC) to deliver detailed design work for QatarEnergy’s Bul Hanine EPIC2 offshore oil and gas redevelopment project in Qatar.

The scope includes the design of 25 subsea pipelines, alongside crossing analysis for 15 umbilicals and two power cables, as QatarEnergy seeks to increase production capacity and extend the life of the ageing offshore oilfield.

Wood said it would draw on its subsea engineering and flow assurance expertise to help design an optimized pipeline network for the project, including managing thermal expansion and ensuring safe interaction where new pipelines cross existing infrastructure.

To remind, COOEC won two bids from QatarEnergy, worth approximately $4 billion, back in September 2025 for work on Bul Hanine offshore redevelopment.



“Wood has a strong track record in delivering offshore detailed design and in optimising installation solutions for complex subsea systems. By working collaboratively with COOEC, we are bringing together complementary strengths that will help accelerate QatarEnergy’s ambition to extend the field’s life, increase capacity and boost production from these critical, ageing assets,” said Gerry Traynor, Regional President – Middle East, Africa & Caspian, at Wood.

“COOEC is glad to be QatarEnergy's trusted partner for the Bul Hanine EPIC2 Project. This is an important milestone which will build on our continual strong track record in the industry, strengthens our presence and commitment to support the energy landscape in the Middle East, and a testament of COOEC's capability in delivering a trusted EPIC solution for mega offshore projects,” added Wu Zhixing, Deputy Director of COOEC.

The award builds on Wood’s previous work on the Bul Hanine redevelopment, where it completed pre-FEED and FEED studies directly for QatarEnergy.

QatarEnergy is redeveloping the Bul Hanine offshore oilfield, located around 120 km east of the Qatari coastline, as part of efforts to counter production decline and double current oil output from the asset.

Categories: Safety & Security Software Maintenance Middle East Engineering Subsea Pipelines Industry News Activity Asia Oil and Gas Workover FPSO Deepwater

Related Stories

KBR to Support Aramco’s Marjan Offshore Field Upgrade

LNG Flows Through Hormuz Hit Seven-Month High

SLB Secures Aramco Well Construction Work for 450 Wells

Saudi Oil Lifeline Shut After Attack as Red Sea Threat Grows

Larsen & Toubro Adds Major ONGC Offshore Project to Orderbook

Technip Energies Nets Engineering Services Job for ADNOC Offshore

TGS Extends Work on Indonesia’s Largest Seismic Acquisition Project

ADNOC, SLB Roll Out AI Platform Across More Than 120 Drilling Rigs

Oil Rises as Uncertainty Clouds US-Iran Peace Talks

FPSO for Azule Energy’s Angola Offshore Field Starts Taking Shape in China

Current News

Valeura Starts Wassana Platform Installation Offshore Thailand

Oil Stabilizes as IEA Moves to Speed Up Emergency Stock Releases

Yinson Production Raises $1.46B to Refinance Agogo FPSO

Oil Climbs on US Storm Threat, Saudi Attack Risks

KBR to Support Aramco’s Marjan Offshore Field Upgrade

Oil Industry Braces for Years of Market Disruption

Eni Taps Yinson Production for Major Ghana FPSO Gas Upgrade

ADNOC Signs Multi-Year LNG Supply Deal with Thailand’s Gulf Group

Iran Set to Keep Hormuz Shut Until Seven Demands Are Met

LNG Flows Through Hormuz Hit Seven-Month High

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com