Santos Drilling Ahead at Pavo-1 Site Offshore Australia

OE Staff
Tuesday, February 15, 2022

Australian oil and gas company Santos is drilling ahead at its Pavo-1 well, off W. Australia, after last week's spud using the Noble Tom Prosser jack-up drilling rig

The Pavo-1, operated by Santos (70%) with Carnarvon as partner (30%) is targeting Caley reservoir sands in a similar canyon style trap to the Dorado field. The Dorado is one of the largest offshore oil discoveries on Australia's North Western Shelf, and Santos is working to develop it using an FPSO and a wellhead platform.

Santos' partner Carnarvon Energy on Tuesday issued a drilling progress status update: "The Noble Tom Prosser jack-up drilling rig commenced operations with drilling the surface hole down to around 175 meters Measured Depth (“MD”) and the conductor was installed and cemented in place. 

Following the setting of the conductor, the 17 ½” hole has been drilled down to section depth of around 1,009 meters MD and the 13 5
/8” casing has been set and cemented in place. 

The rig is preparing to drill ahead in the 12 ¼” hole. The rig will drill ahead in the 12 ¼” hole to approximately 3,000 meters MD before setting the 9 ⅝” liner. No hydrocarbons are anticipated to be intersected in this hole section.

After setting the 9 ⅝” liner the rig will drill ahead in the 8 ½” hole section through the expected reservoir interval.

 Credit: Carnarvon Energy

The Pavo-1 well is targeting a gross mean recoverable volume of 82 million barrels of liquids and 108 Bcf of gas in the Caley Formation sands which flow tested at equipment limits of around 11,000 barrels of oil per day in the Dorado-3 well. The prospect has an estimated one-in-three (34%) geological probability of success.

Carnarvon holds a 30% interest in this resource, and Santos holds 70%. 

After drilling the primary Caley target, the joint venture has the option to drill into deeper stratigraphy including the Lower Archer Formation Dumont Member sands, and the Permian carbonates.

"Information from these intervals will be highly valuable in assessing the substantial exploration potential north and east of the Pavo prospect," Carnarvon said.

Following completion of the Pavo-1 well, the rig will drill the Apus-1 well which is located around 20km southwest of the Pavo-1 well location.

Categories: Drilling Activity Rigs Australia/NZ Shallow Water

Related Stories

Transocean-Valaris Tie-Up to Create $17B Offshore Drilling Major with 73 Rigs

Vantage Drilling’s Ultra-Deepwater Drillship Heads to India Under $260M Contract

Northern Offshore’s Energy Emerger Rig Up for Drilling Job off Oman

JERA Lifts First LNG Cargo From Barossa Gas Project in Australia

Seadrill Firms Up Offshore Drilling Workload with Multi-Region Contract Awards

Murphy Oil Appraisal Well Boosts Resource Outlook at Field off Vietnam

Offshore Rig Outlook: As 2025 Challenges Fade, Path Ahead Brightens

CNOOC Launches New Offshore Oil Development in Southern China

Petronas Enlists MISC for FPU Job at Gas Field Offshore Brunei

Blackford Dolphin Semi-Sub to Keep Drilling Offshore India

Current News

Petronas Takes Operatorship of Oman’s Offshore Block 18

Mubadala Hires SLB for Deepwater Drilling Services Offshore Indonesia

Malaysia Offers Nine Exploration Blocks in 2026 Bid Round

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Transocean-Valaris Tie-Up to Create $17B Offshore Drilling Major with 73 Rigs

Malaysia Oil and Gas Projects Advance with Petronas' PSC and Farm-Out Deals

Vantage Drilling’s Ultra-Deepwater Drillship Heads to India Under $260M Contract

EnQuest Secures Extension for Vietnam's Offshore Block

Japan's Mitsui in Advanced Talks for Stake in Qatar’s North Field LNG Project

Japan’s JERA Agrees Long-Term LNG Supply from Middle East

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com