Norway Postpones Decision on Arctic Oil Terminal

Friday, December 14, 2018

The Norwegian government has postponed a decision on whether to mandate the construction of an oil processing terminal near the Arctic tip of northern Europe until the third quarter of next year, it said on Friday.

If built, the onshore Veidnes terminal would receive crude via a pipeline from Equinor's offshore Johan Castberg oilfield, which is expected to start producing in late 2022.

Equinor originally ditched plans for an onshore terminal in order to save costs, preferring instead to load oil on to crude tankers at the field before exporting it to global markets.

Parliament earlier this year urged the government to secure the construction of an onshore terminal, however, as it would generate significant investment and jobs in the remote region.

The energy ministry said on Friday further studies were needed into the project, which is supported by labor unions.

Environmentalists, however, oppose both the oilfield and the proposed terminal.


(Reporting by Terje Solsvik; Editing by Mark Potter)

Categories: Tankers Energy Arctic Operations Pipelines FPSO Arctic Oil Floating Production Government Regulations

Related Stories

Floating Production Outlook: Pipeline Looks Huge, But Not All Projects Are Created Equal

Shell Brings Deepwater Gas Fields Onstream off Malaysia

Singapore Seeks LNG Floating Storage Operators to Expand Bunkering Ops

TotalEnergies to Take Operatorship of Two Major Gas Fields off Malaysia

Strohm Nets Ultra-Deepwater Supply Deal for Southeast Asia’s Gas Scheme

Idemitsu Taps PV Drilling for Vietnam's Offshore Drilling Campaign

Finder Energy Selects Eneos’ Rig for Drilling Job off Timor-Leste

Eni Agrees Indonesian Gas Asset Sales to Pertamina and Medco

Oil Climbs on US Storm Threat, Saudi Attack Risks

SLB Secures Aramco Well Construction Work for 450 Wells

Current News

Petronas Names ‘World's First’ Nearshore FLNG Facility

Oil Falls as Supply Glut Concerns Overshadow Hormuz Shipping Risks

Masirah Oil Delays Yumna Production as Drilling Progresses off Oman

Searah Starts Production from New Bukit Tua Well Offshore Indonesia

NMDC Energy to Acquire Wasco’s Engineering Division for $190M

China’s COOEC Lands $800M QatarEnergy Subsea Contract

Oil Prices Rise as Houthi Strikes Revive Supply Disruption Fears

COSL Places $1.64B Order for 59 Offshore Support Vessels

When Contractors Collide: Keeping Offshore Energy Projects on Schedule

Floating Production Outlook: Pipeline Looks Huge, But Not All Projects Are Created Equal

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com