Norway Postpones Decision on Arctic Oil Terminal

Friday, December 14, 2018

The Norwegian government has postponed a decision on whether to mandate the construction of an oil processing terminal near the Arctic tip of northern Europe until the third quarter of next year, it said on Friday.

If built, the onshore Veidnes terminal would receive crude via a pipeline from Equinor's offshore Johan Castberg oilfield, which is expected to start producing in late 2022.

Equinor originally ditched plans for an onshore terminal in order to save costs, preferring instead to load oil on to crude tankers at the field before exporting it to global markets.

Parliament earlier this year urged the government to secure the construction of an onshore terminal, however, as it would generate significant investment and jobs in the remote region.

The energy ministry said on Friday further studies were needed into the project, which is supported by labor unions.

Environmentalists, however, oppose both the oilfield and the proposed terminal.


(Reporting by Terje Solsvik; Editing by Mark Potter)

Categories: Tankers Energy Arctic Operations Pipelines FPSO Arctic Oil Floating Production Government Regulations

Related Stories

Seatrium Maintains $12.8B Order Book on Renewables and FPSO Progress

Petrobras’ New FPSO Sets Sail From South Korea to Brazil's Santos Basin

Sponsored: Energy and Finance Chiefs Call for Sound Policy, Stable Frameworks at ADIPEC

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

Eni-Petronas Gas Joint Venture Up for Launch in 2026

SBM Offshore, SLB to Optimize FPSO Performance Using AI

SBM Offshore Starts Construction of FSO for Trion Oil Field off Mexico

Seatrium Secures ABS Backing for Deepwater FPSO Design

MDL Secures Cable Laying Job in Asia Pacific

Saipem Wins FEED Contract For Abadi LNG Project FPSO Module In Indonesia

Current News

Blackford Dolphin Semi-Sub to Keep Drilling Offshore India

Aramco Expands US Partnerships with $30B in New Deals

Pakistan Greenlights TPOC-Led Offshore Exploration in Block-C

TechnipFMC to Supply Subsea Systems for Eni’s Maha Deepwater Project

SED Energy’s GHTH Rig Kicks Off Ops for PTTEP

MODEC Forms Dedicated Mooring Solutions Unit

Seatrium Maintains $12.8B Order Book on Renewables and FPSO Progress

Petrobras’ New FPSO Sets Sail From South Korea to Brazil's Santos Basin

Eneos Warns on Skyrocketing Costs fo Offshore Wind

Mooreast to Assess Feasibility of Floating Renewables Push in Timor-Leste

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com