Norway Postpones Decision on Arctic Oil Terminal

Friday, December 14, 2018

The Norwegian government has postponed a decision on whether to mandate the construction of an oil processing terminal near the Arctic tip of northern Europe until the third quarter of next year, it said on Friday.

If built, the onshore Veidnes terminal would receive crude via a pipeline from Equinor's offshore Johan Castberg oilfield, which is expected to start producing in late 2022.

Equinor originally ditched plans for an onshore terminal in order to save costs, preferring instead to load oil on to crude tankers at the field before exporting it to global markets.

Parliament earlier this year urged the government to secure the construction of an onshore terminal, however, as it would generate significant investment and jobs in the remote region.

The energy ministry said on Friday further studies were needed into the project, which is supported by labor unions.

Environmentalists, however, oppose both the oilfield and the proposed terminal.


(Reporting by Terje Solsvik; Editing by Mark Potter)

Categories: Tankers Energy Arctic Operations Pipelines FPSO Arctic Oil Floating Production Government Regulations

Related Stories

ConocoPhillips, CNOOC Put Penglai Field off China Into Full Operation

ADNOC, SLB Roll Out AI Platform Across More Than 120 Drilling Rigs

Eni-Petronas JV Starts Indonesia-Bound FPSO Construction

ABL Gets Papua New Guinea FSO Job

Inpex Starts Construction of Indonesia's Abadi LNG Project

Israel Steps Up Mediterranean Gas Search

SBM Offshore, SWS Sign Deal for Seventh FPSO Hull

Floating Nuclear: A New Offshore Energy Frontier

Markets: Oil Majors Reload Exploration Hoppers Across Sub-Saharan Africa

ONGC Expands BP Partnership with Western Offshore Basin Services Contract

Current News

Saipem Bags Commissioning Contract for Türkiye-Bound FPU

Oil Jumps as Houthi Strikes Disrupt Saudi Energy Operations

Petronas Turns to AI to Accelerate Upstream Investment

PTTEP, Petronas Ink 35-Year Malaysia-Thailand Gas Deals

Iran Outlines Terms for Restoring Hormuz Shipping

Technip Energies Nets Engineering Services Job for ADNOC Offshore

Seatrium Nears Dual FPSO Sailaway for Petrobras' Búzios Field

Strait of Hormuz Shipping Marks Slight Rise

China's CNOOC Posts Record First-Half Profit

BP Completes Central Azeri Platform Maintenance, Ramps Up Production

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com