LogIn LogOut

Marine Masters Secures Wellhead Platforms Installation Job Off India

February 27, 2025

(Credit: Marine Masters)
(Credit: Marine Masters)

Dutch offshore contractor Marine Masters has secured work on an offshore installation project for the greenfield Bhasker A & B platforms, designed and constructed by Indian energy company SunPetro.

The project, managed by main installation contractor ACE Pipeline and directly overseen by Consolidated Support Services PTE LTD (CSS), involves the development of two wellhead platforms featuring jackets with integrated boat landings and topsides.

The Marine Masters work encompasses detailed preparation for lifting and mooring activities, the lifting of two jackets and their respective topsides, the upending and installation of piles, and the creation of a dedicated platform for subsea and piling operations.

Notably, each jacket weighs approximately 800 tonnes, underscoring the project's technical demands and the need for precise engineering execution.

To support the operations, Marine Masters has chartered the Conquest MB1, a heavy-lift barge boasting a lifting capacity of approximately 1,400 tonnes.

The vessel is further equipped with two mobile cranes, with lifting capacities of 180 tonnes and 500 tonnes respectively, ensuring that all phases of the project are executed safely and efficiently.

Currently in transit to Mumbai, the Conquest MB1 is scheduled to arrive on March 7, 2025.

After obtaining the necessary inward clearance and completing all mobilization activities, the vessel will proceed to the offshore location in the Gulf of Kutch, 110 nautical miles south of Kandla in India, with an expected arrival on March 20, 2025.

The installation work is anticipated to be completed by May 15, 2025.

“We are honored to support Sun Petro, ACE Pipeline, and CSS in this challenging, high-profile project. The deployment of the Conquest MB1 exemplifies our commitment to leveraging advanced marine technology and operational expertise to execute complex offshore installations safely and efficiently.

“The crane barge will remain in the region and is available for other challenging salvage, decommissioning, or transport and installation projects,” said Henk Smith of Marine Masters.

Current News

Marine Masters Secures Wellhead Platforms Installation Job Off India

Marine Masters Secures Wellhead Platforms Installation Job Off India

MODEC and Samsung Team Up to Install Carbon Capture Tech on FPSO

MODEC and Samsung Team Up to Install Carbon Capture Tech on FPSO

ADNOC Signs 15-Year LNG Supply Deal with Osaka Gas for Ruwais Project

ADNOC Signs 15-Year LNG Supply Deal with Osaka Gas for Ruwais Project

Eni, Petronas to Set Up Joint Venture for Assets in Indonesia and Malaysia

Eni, Petronas to Set Up Joint Venture for Assets in Indonesia and Malaysia

Sapura Energy Nets $720M from Multiple Drilling Services Contracts

Sapura Energy Nets $720M from Multiple Drilling Services Contracts

Shell Predicts 60% Rise in LNG Demand by 2040 with Asia Leading the Way

Shell Predicts 60% Rise in LNG Demand by 2040 with Asia Leading the Way

Petronas Inks Two More PSCs for Bid Round 2024, Launches Round 2025

Petronas Inks Two More PSCs for Bid Round 2024, Launches Round 2025

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Ontario to hold election as Canada and US argue over proposed tariffs
Russell: Asia's declining crude oil imports will challenge demand estimates for 2025
Document shows that the Paris prosecutor has dropped his case against Apple regarding Congo minerals.
https://accounts.newwavemedia.com