LogIn LogOut

First Topside Module Lifted on Coral South FLNG Hull

May 27, 2020

The Coral South FLNG hull was launched in January - Credit: Eni
The Coral South FLNG hull was launched in January - Credit: Eni

Eni-operated Coral South FLNG project is making progress with the first topside module installed aboard the hull of the under-construction FLNG unit destined to develop offshore gas fields in Area 4 of the Rovuma Basin, Mozambique.

Coral FLNG SA, an Eni-led JV developing the project, said Wednesday that the power generation module had been lifted aboard the hull, marking the start of the integration between the hull, launched in January, and the massive topside (12 process modules of around 70,000 tons), both currently under construction in South Korea.

"The construction of the FLNG facility, which is primarily carried out at Samsung Heavy Industry in South Korea with 7 main operating centers worldwide and a global supply chain, is progressing well aiming towards the commencement of production in 2022," Coral FLNG said.

The Coral South FLNG, a floating facility for the processing, liquefaction, and storage of gas, will be moored approximately 50 kilometers offshore of the Palma bay in the northern province of Cabo Delgado, Mozambique. Partners in the Coral FLNG SA are Eni, ExxonMobil, CNODC, ENH, Galp, and Kogas.

The 432 meters long FLNG unit will have a gas liquefaction capacity of 3.4 million tons per year (MTPA), and it will be the first FLNG ever deployed in deep waters, at a water depth of approximately 2,000 meters. While not the first operational FLNG unit in Africa, the unit will be the first purpose-build FLNG in Africa.

Namely, Cameroon was the first African nation to bring online an FLNG unit (in 2018), however, the vessel was converted from the 1975-built Moss LNG carrier and not purpose-built.

Caption; Topside module lifting - Credit: Coral FLNG



Current News

Boskalis Serves MMHE with Arbitration Notice, Seeking $12M for Bokor Project Delays

Boskalis Serves MMHE with Arbitration Notice, Seeking $12M for Bokor Project Delays

Emperor Energy Buys Judith Field Seismic Data. Gets More Time to Find Drilling Partner

Emperor Energy Buys Judith Field Seismic Data. Gets More Time to Find Drilling Partner

China: CNOOC Searching for Three Missing After Fire on Offshore Platform Doused

China: CNOOC Searching for Three Missing After Fire on Offshore Platform Doused

Velesto Secures 7-well Drilling Deal with Shell in Malaysia

Velesto Secures 7-well Drilling Deal with Shell in Malaysia

Australia: Santos Looking to Sell Down Stake in Dorado Offshore Oil Project

Australia: Santos Looking to Sell Down Stake in Dorado Offshore Oil Project

In Break with Rivals, Oxy CEO Says Carbon Tax Would be 'Bad'

In Break with Rivals, Oxy CEO Says Carbon Tax Would be 'Bad'

Chevron, Hokkaido Gas Ink LNG Supply Deal

Chevron, Hokkaido Gas Ink LNG Supply Deal

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com