LogIn LogOut

Marine Survey Work Starts for Greenlink Interconnector

September 25, 2018

MV Franklin ( © MMT Sweden)
MV Franklin ( © MMT Sweden)

Current News

Sponsored: Policy, AI, and Capital Take Center Stage at ADIPEC 2025

Sponsored: Policy, AI, and Capital Take Center Stage at ADIPEC 2025

Major Oil and Gas Projects Drive Strong OSV Demand in the Middle East

Major Oil and Gas Projects Drive Strong OSV Demand in the Middle East

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

PTTEP Orders OneSubsea Systems for Two Deepwater Projects off Malaysia

PTTEP Orders OneSubsea Systems for Two Deepwater Projects off Malaysia

Russia's Lukoil Takes Up Gunvor’s Offer for Foreign Assets

Russia's Lukoil Takes Up Gunvor’s Offer for Foreign Assets

How Hot Is Your Cable? Understanding Subsea Cable Thermal Performance

How Hot Is Your Cable? Understanding Subsea Cable Thermal Performance

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Gunvor's asset bid should not be considered by the Kremlin, says Kremlin after Lukoil drops its bid
Blog finds that climate risk rarely causes ECB collateral to be downgraded
As trade tensions ease, copper prices rise
https://accounts.newwavemedia.com