MODEC Ramps Up Hammerhead FPSO Work After ExxonMobil's Go-Ahead

Tuesday, September 30, 2025

MODEC has been awarded the full engineering, procurement, construction, and installation (EPCI) scope to develop a floating production, storage and offloading (FPSO) vessel for the Hammerhead project in Guyana following a final investment decision (FID) by ExxonMobil.

In April 2025, MODEC received a Limited Notice to Proceed (LNTP) enabling it to commence FPSO design activities to support the earliest possible startup in 2029, subject to required government approvals.

Phase One of the contract, covering front-end engineering and design (FEED), has since been completed and MODEC is advancing Phase Two, EPCI, execution readiness in line with project governance.

The Hammerhead FPSO will have the initial annual average production of 150,000 barrels of oil per day (BOPD), along with associated gas and water. It will be moored at a water depth of approximately 1,025 meters using SOFEC’s Spread Mooring System.

The Hammerhead FPSO will be MODEC’s second for use in Guyana, following the Errea Wittu, which is currently being built for ExxonMobil Guyana’s Uaru project.

As with the Uaru Project, MODEC will provide ExxonMobil with operations and maintenance services for the FPSO for 10 years from first oil.

“We are honored to be entrusted with the full EPCI scope for Hammerhead. This award reflects MODEC’s integrated capabilities to design, build and operate—from concept and FEED through to safe execution and timely delivery of the project.

“Building on the strong progress we’ve made on the Uaru Project, this milestone further underscores the momentum of our collaboration. MODEC’s strategic relationship with ExxonMobil Guyana positions us to work with them and our stakeholders to create lasting value throughout the project lifecycle,” said Soichi Ide, Head of Floating Production Solutions Business Unit of MODEC.

To remind, ExxonMobil made a final investment decision for the Hammerhead development earlier in September 2025, after receiving the required regulatory approvals. 


Categories: Industry News Activity South America Oil and Gas FPSOs

Related Stories

SBM Offshore Starts Construction of FSO for Trion Oil Field off Mexico

Seatrium Secures ABS Backing for Deepwater FPSO Design

Hibiscus Petroleum Starts Drilling at Teal West Field off UK

Aquaterra Energy Nets Subsea Analysis Contracts with INPEX off Indonesia

PTTEP Hires McDermott for Deepwater Subsea Job off Malaysia

TotalEnergies Inks 10-Year LNG Supply Deal with South Korea’s KOGAS

Seatrium Engages Axess Group to Clear FPSOs for Brazil Deployment

Inpex Kicks Off FEED Work for Abadi LNG Scheme Offshore Indonesia

Petronas Expands Suriname Portfolio with Deepwater Block Acquisition

MODEC, Carbon Clean to Advance FPSO-Mounted Carbon Capture Tech

Current News

MODEC Ramps Up Hammerhead FPSO Work After ExxonMobil's Go-Ahead

Aesen, DOC JV Targets Subsea Cable Logistics

Timor Gap Boosts Stake in Finder Energy’s Timor-Leste Oil Fields

SBM Offshore Starts Construction of FSO for Trion Oil Field off Mexico

Russia Targets 2028 for Sakhalin-3 Gas Project Start Up

Seatrium Secures ABS Backing for Deepwater FPSO Design

MDL Secures Cable Laying Job in Asia Pacific

Hibiscus Petroleum Starts Drilling at Teal West Field off UK

Yinson Production Nets DNV Approval for New FPSO Hull Design

Hanwha Ocean's Tidal Action Drillship Starts Maiden Job with Petrobras

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com