Valeura Boosts Production at Jasmine Field with Five New Wells Now Onstream

Wednesday, November 27, 2024

Canada-based oil and gas company Valeura Energy has completed an infill drilling campaign at the Jasmine field in the Gulf of Thailand, increasing the production at the field for 26% with five new wells coming onstream.

Valeura drilled a five well program, comprised of two infill development wells on the Jasmine A platform, completed in September 2024 and previously announced, and more recently, three infill development wells on the Jasmine D platform, which were all successful and have been brought online as producers while also successfully appraising several additional reservoir intervals.

The JSD-42 well drilled a production-oriented primary objective in the 250 sand reservoir, and is believed to be optimally positioned at the crest of the structure. 

The well was completed as a producer within this zone and has begun producing oil in line with management’s expectations.

In addition, the JSD-42 well evaluated several secondary appraisal targets, which resulted in five further zones being completed as future producing reservoirs, and also encountered several additional oil-bearing intervals which may be the subject of further infill development drilling in due course.

The JSD-41H and JSD-43H wells were both drilled as horizontal development infills within the 680-1 sand reservoir, with the objective of more efficiently sweeping oil from this already-producing interval.

Both wells were geosteered across horizontal intervals measuring over 2,000ft (measured depth), and encountered 100% net sand.

With all five wells completed as producers and online, aggregate oil production from the field has averaged 9,801 bbls/d (before royalties) over the period November 19-25, 2024, an increase of 26% from rates just prior to the new wells coming online (7,764 bbls/d over the period September 6-12, 2024).

Following the Jasmine D infill drilling programme, the company’s contracted drilling rig has been moved to the Manora field on Licence G1/48 (70% working interest), where it has started operations on a five well infill drilling programme, comprised of three production-oriented wells and two appraisals.

The Jasmine field is part of Licence B5/27, where Valeura Energy has 100% operated working interest.

“I am very pleased with our drilling performance at Jasmine, which has resulted in aggregate oil production rates of nearly 10,000 bbls/d (before royalties) over the last seven days. Maintaining oil production at this asset is key to generating ongoing cashflow from our portfolio.

“In addition, the fact that we continue to see appraisal successes at this relatively mature field bodes well for our objective to further extend the economic life of the asset. We expect the results of these wells, and the recent production rates to be considered as part of our year-end reserves assessment, and to support our target of achieving more than a 100% reserves replacement ratio,” said Sean Guest, Valeura’s President and CEO.

Categories: Drilling Industry News Activity Production Asia Oil and Gas

Related Stories

Japan’s JERA Agrees Long-Term LNG Supply from Middle East

Conrad, Empyrean Agree Settlement Framework Over Duyung PSC Interests

JERA Lifts First LNG Cargo From Barossa Gas Project in Australia

Murphy Oil Appraisal Well Boosts Resource Outlook at Field off Vietnam

India Seeks $30B from Reliance, BP Over Gas Shortfall at Offshore Fields

CNOOC Launches New Offshore Oil Development in Southern China

CNOOC Puts New South China Sea Development Into Production Mode

ADES Nets $63M Contract for Compact Driller Jack-Up off Brunei

PTTEP Orders OneSubsea Systems for Two Deepwater Projects off Malaysia

US Pressure on India Could Propel Russia's Shadow Oil Exports

Current News

Japan's Mitsui in Advanced Talks for Stake in Qatar’s North Field LNG Project

Japan’s JERA Agrees Long-Term LNG Supply from Middle East

QatarEnergy, Petronas Ink 20-Year LNG Supply Agreement

Eni Enlists Shearwater for 3D Seismic Survey in Timor Sea

Conrad, Empyrean Agree Settlement Framework Over Duyung PSC Interests

Northern Offshore’s Energy Emerger Rig Up for Drilling Job off Oman

Petronas Plans Ramp-Up in Exploration, Production Over Three Years

Australia and Timor-Leste Push to Advance Greater Sunrise Gas Field

MODEC, Eld Energy Partnership Targets Low-Carbon FPSO Power

JERA Lifts First LNG Cargo From Barossa Gas Project in Australia

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com