Israel Shuts Down Production from Tamar Offshore Gas Field

Reuters
Monday, October 9, 2023

Israel is suspending production at the Tamar gas field off its southern coast and will seek alternative fuel sources to meet its needs, the energy ministry said on Monday, following three days of violence in the region.

Chevron, which operates the field, confirmed it had been instructed by the ministry to shut down the field, located some 25 kilometers (15.5 miles) off the city of Ashdod along Israel's southern Mediterranean coast.

Israel's largest offshore gas field, Leviathan, continues to operate normally, Chevron said.

Chevron, Tamar field's operator, owns a 25% stake, while Isramco holds 28.75%, the UAE's Mubadala Petroleum 22%, Tamar Petroleum  16.75%, Dor Gas 4% and Everest 3.5%.

(Reuters - Reporting by Dan Williams, Ari Rabinovitch and Ron Bousso; editing by Jason Neely)

Categories: Energy Middle East Activity Production Gas Mediterranean Sea

Related Stories

Woodside and Jera Agree LNG Cargoes Supply for Japan’s Winter Period

MODEC and Terra Drone Renew FPSO Drone Inspection Partnership

Chuditch Gas Field Drilling Ops Get Delayed to Next Year

Indonesia's Medco Starts Production at Natuna Sea Fields

China's ENN, Zhenhua Oil Ink LNG Supply Deals with ADNOC

INEOS Wraps Up Acquisition of CNOOC’s US Oil and Gas Assets

Woodside to Shed Some Trinidad and Tobago Assets for $206M

CNOOC Sees 11% Profit Growth in 2024 Driven by Record Oil Production

CNOOC Starts Production at Two New Oil and Gas Projects

ADNOC Signs 15-Year LNG Supply Deal with Osaka Gas for Ruwais Project

Current News

Woodside and Jera Agree LNG Cargoes Supply for Japan’s Winter Period

Petronas Expands Suriname Portfolio with Deepwater Block Acquisition

Japanese Oil and Gas Firm Enters Two Blocks off Malaysia

Yinson Production, “K” LINE Target Europe's CCS with FSIU and LCO2 Solutions

Woodside Agrees Long-Term LNG Supply with Petronas Unit

MODEC and Terra Drone Renew FPSO Drone Inspection Partnership

Yinson Production Closes $1B Investment to Drive Further Growth

Petronas-Eni Upstream Joint Venture to Take Up to Two Years to Set Up

Wood JV Gets EPC Job for Shell off Brunei

Chuditch Gas Field Drilling Ops Get Delayed to Next Year

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com