Valeura Energy Books Jack-up Rig for Wassana Oil Field Drilling

OEDigital
Thursday, October 6, 2022

Valeura Energy, an oil and gas company with assets offshore in the Gulf of Thailand and the Thrace Basin of Turkey, has agreed with Petrovietnam Drilling and Well Service Corporation to charter the PV Drilling I jack-up drilling rig to support its Gulf of Thailand operations in 2023.

The PV Drilling I rig is expected to mobilize to the Wassana oil field in mid Q2 2023, where it will conduct an initial scope of work comprised of the company's five well infill drilling program.

The arrangement includes an option to extend the scope of work thereafter, to include additional drilling operations at the company's discretion.

In Q2 2022, Valeura signed and then closed a share purchase agreement to acquire KrisEnergy International (Thailand) Holdings Ltd. which owns and operates two licences in the offshore Gulf of Thailand. 

The acquisition includes the suspended Wassana oil field and the fully appraised Rossukon oil field. Additionally, through a separate agreement, the company agreed to acquire the Mobile Production Unit Ingenium (“MOPU”) which is on location at the Wassana oil field.

Valeura reiterated its previous target that it expects to re-start production from the Wassana oil field in Q4 2022, with initial oil production rates of up to 3,000 bbls/d (net to the 89% working interest held by Valeura's subsidiaries) and is targeting an increase to approximately 4,500 bbls/d (net) as a result of the 2023 infill drilling program. 

"The company is continuing to make good progress on the key work streams in support of production re-start at Wassana, including securing the recertification of the field's mobile offshore production unit facility and procuring a suitable floating storage and offloading vessel," Valerua said.

Sean Guest, President and CEO said: "We remain confident in our ability to resume oil production at the Wassana field later this quarter.  With positive progress on all key work streams, supporting the return to active production operations, we are already setting our sights on our growth targets, and with this drilling rig contract in place we will be well-prepared to increase production in 2023."


Categories: Energy Drilling Industry News Activity Asia Shallow Water Drilling Rigs

Related Stories

Jadestone Secures Gas Sales Deal for Fields Offshore Vietnam

Eni Makes Major Gas Discovery Offshore Indonesia

Saipem Bags $400M in Offshore Contracts from Aramco in Saudi Arabia

TotalEnergies Eyes Black Sea Exploration with Türkiye’s TPAO

Borr Drilling Expects Higher Activity as Rigs Return to Work

Oil Surges Over 7% to Above $102 Ahead of US Hormuz Blockade

UK Declines to Support US Hormuz Blockade, PM Starmer Says

Sunda, Finder Target Shared Rig for Timor-Leste Offshore Drilling

Arabian Drilling Flags Temporary Offshore Rig Suspensions in Persian Gulf

ADES Expects Up to 44% Earnings Rise Despite Regional Tensions Impacting Rigs

Current News

Jadestone Secures Gas Sales Deal for Fields Offshore Vietnam

Oil Flows to Lag Even if Hormuz Strait Reopens

Eni Makes Major Gas Discovery Offshore Indonesia

Strike Threat Grows at Ichthys LNG after Workers Reject Deal

Pertamina Unit to Operate Indonesia’s Lavender Block under 30-Year PSC

MidEast Energy Output Recovery to Take Two Years, IEA Says

Metropolitan CCS Cleared to Drill CO2 Storage Wells off Japan

Saipem Bags $400M in Offshore Contracts from Aramco in Saudi Arabia

Toyo, OneSubsea Form Subsea CCS Partnership

Japan to Launch $10B Fund to Help Asia Secure Oil

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com