Key Milestone: Woodside Publishes EIS for Browse to North West Shelf (NWS) Project

Thursday, September 15, 2022

Australian oil and gas company Woodside on Thursday published the final Environmental Impact Statement (EIS) for the proposed Browse to
North West Shelf (NWS) Project in Australia, as directed by the Australian Department of Climate Change, Energy, the Environment and Water (DCCEEW).

The offshore area comprising the Brecknock, Calliance, and Torosa fields - the Browse resource - sits in the offshore Browse Basin, around 425 kilometers north of Broome in Western Australia.

The final EIS includes responses to comments received during the public consultation process held over an eight-week period from December 2019 to February 2020.

"As operator of the proposed Browse to NWS Project, Woodside welcomes the publication of the final EIS as a key milestone for the project. The DCCEEW will now prepare its recommendation report and provide it to the Minister," Woodside said.

The proposed Browse to NWS Project would send feed gas from fields in the offshore Browse Basin to be processed at the NWS Project’s Karratha Gas Plant. Browse and the NWS Project Extension are expected to contribute to our communities for decades to come.

According to Woodside, the proposed Browse to NWS Project could contribute to energy security in Western Australia and in the Asia Pacific region, with production capacity of 11.4 million tonnes per year (LNG, LPG and Domestic Gas). 

Woodside CEO Meg O'Neill said moving into the assessment phase for the proposed project was a significant and positive step in the regulatory approval process. “The final EIS provides comprehensive detail of potential environmental impacts, proposed mitigations and management measures.

"The processing of Browse gas through the Karratha Gas Plant could provide energy needed in Western Australia and overseas, while providing jobs and taxation revenue that support our host communities,” she said.

Key work activities continue in support of progress towards front-end engineering design entry, Woodside said.

The corresponding State Environmental Review Document Response to Submissions will also be published once accepted by the Western Australian Environmental Protection Authority, the company added.


Categories: Energy Activity Production Australia/NZ

Related Stories

Aramco Picks McDermott for Energy Projects in Saudi Arabia

Ichthys LNG Strike Causes Delay to Taiwan-Bound Cargo

Cambodia Starts UN Process to Resolve Maritime Dispute with Thailand

Azerbaijan’s Absheron Gas Project Advances with New Sales Agreement

BP Launches Gas Production at Azerbaijan’s Giant ACG Field

BP to Boost Azerbaijan Portfolio with Babek Gas Field Operatorship Takeover

Petrobras Nears Deal With SBM Offshore for Two Sergipe FPSOs

Oil Prices Fall Amid Signs of US-Iran Ceasefire Extension Deal

Planned Strike at Inpex’s Ichthys LNG Facility Called Off as Talks Continue

Strike Threat Grows at Ichthys LNG after Workers Reject Deal

Current News

Oil Slips as Oman Reports Normal Operations at Key Oil Terminal

Petronas Signs Offshore Oil Recovery Collaboration Deal

SBM Offshore to Sell 45% Stake in Mexico-Bound FSO to NYK

Conrad Secures Drilling Rig for Mako Gas Field off Indonesia

Oman’s Block 50 Offshore Drilling Ops Face Further Delays

Aramco Picks McDermott for Energy Projects in Saudi Arabia

Velesto’s Jack-Up Rig Up for Gulf of Thailand Drilling Campaign

Kuwait Sees 70% Oil Output Recovery within Two Months of Hormuz Reopening

Capricorn Energy Grants Third Extension for Potential Takeover Offer

Ichthys LNG Strike Causes Delay to Taiwan-Bound Cargo

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com