Sapura Energy Bags FEED for Santos' Dorado Offshore Platform

OE Staff
Thursday, August 26, 2021

Malaysia's Sapura Energy has won the FEED contract for the design, construction, and installation of the Wellhead Platform (WHP) for Dorado offshore development in Western Australia.

The WHP will be an unmanned installation, located in 90 meters water over the Dorado oil and gas field, hosting the development wells and gas reinjection wells with minimal processing facilities, remotely operated from an FPSO located around two kilometers away. 

Dorado, planned to be developed in two phases, will initially produce oil and condensate through a WHP and FPSO. 

Gas will be reinjected in the initial phase to enhance oil and condensate recovery, followed by a planned future phase of gas production to backfill Santos’ domestic gas infrastructure in WA. 

Development drilling will be conducted with a jack-up drilling rig after the WHP has been installed, with drilling of the wells planned for 2024 and 2025.

The initial gross liquids production rate for Dorado is expected to be between 75,000 and 100,000 barrels per day of high-quality oil, with the first production set for 2026.

The news of the WHP FEED comes after Santos earlier this week awarded the FPSO FEED contract to Altera Infrastructure (formerly Teekay Offshore).

Santos CEO  Kevin Gallagher said: “This contract for the wellhead platform is the project’s last significant commitment as we progress towards a project final investment decision around the middle of next year."

"The WHP is a critical component of the development requiring a company with Sapura’s deep construction and installation experience. The design allows for the integrated development of both the gas and liquids resource and retains sufficient flexibility to support future exploration success, with the Pavo and Apus prospects to be drilled early next year. 

"Whilst operating unmanned, the WHP will have several innovative features including sophisticated reservoir performance monitoring functionality to facilitate optimal reservoir recovery.”

Santos has an 80 per cent interest in the Dorado project and is operator. The remaining interest is held by Carnarvon Petroleum.

Categories: Energy Engineering Activity Production Asia Australia/NZ

Related Stories

TPAO, SOCAR and BP to Ink Caspian Sea Oil and Gas Production Deal

Keyfield Ventures into Indonesia’s Oil and Gas Market with New Partner

Fire Contained at Vietnamese Oil Platform Undergoing Decommissioning (Video)

Scarborough FPU's Topsides and Hull Come Together in Major Engineering Feat (Video)

INEOS Wraps Up Acquisition of CNOOC’s US Oil and Gas Assets

CNOOC Sees 11% Profit Growth in 2024 Driven by Record Oil Production

‘Ultra-Mega’ Offshore Deal for L&T at QatarEnergy LNG’s North Field Gas Scheme

Shell Launches Next Phase of Malaysia's Deepwater Project with First Oil Production

Valeura Wraps Up Infill Drilling Campaign in Gulf of Thailand

CNOOC Brings Online Second Phase of Luda Oil Field Project in Bohai Sea

Current News

MODEC, Carbon Clean to Advance FPSO-Mounted Carbon Capture Tech

Aker Solutions, PTAS JV Hooks Brownfield Services Extension off Brunei

CDWE Wraps Up Pin Pile Installation Job for Taiwanese Offshore Wind Farm

BP Expands Oil and Gas Scope in Azerbaijan with New Projects and Exploration Rights

Azeri SOCAR Plans New Agreements with Oil and Gas Majors

TPAO, SOCAR and BP to Ink Caspian Sea Oil and Gas Production Deal

Fugro Lands Deepwater Gas Field Job in Southeast Asia

OMV Exits Ghasha Gas Project off UAE with Lukoil Stake Sale

China's Sinopec Laucnhes $690M Hydrogen Venture Capital Funds

CIP, ACEN Partner Up for First Large-Scale Offshore Wind Farm in Philippines

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com