BW Offshore Taps NOV's APL for Barossa FPSO STP System

OE Staff
Tuesday, May 11, 2021

FPSO specialist BW Offshore has awarded NOV's APL a contract to supply a large submerged turret production (STP) system for the FPSO to be deployed at Santos' Barossa gas and condensate field located offshore of Australia.

The Barossa field is located about 186 miles (300 kilometers) northwest of Darwin in the Timor Sea, with water depths ranging from 720 to 920 feet (220 meters and 280 meters).

The $3.6 billion Barossa development, sanctioned by Santos in March, consists of infield subsea infrastructure tied back to the centrally located FPSO.

The FPSO will process high-pressure reservoir fluids for gas export to the Darwin liquefied natural gas (LNG) facility via a 180-mile (290-kilometer) subsea pipeline for condensate storage and offloading.

The Barossa FPSO will be a new, purpose-built vessel equipped with an APL STP system, which provides permanent mooring and connection to subsea facilities. The FPSO is designed for a 25-year life of uninterrupted operation without drydocking. APL is part of NOV's Completion & Production Solutions business.

"Our STP system is a unique, innovative, and flexible turret mooring system for FPSOs. The system includes our STP swivel, which is designed for high pressures, temperature, and volumes, and the system transfers all fluids, signals, and power between the subsea system and the freely weathervaning production vessel," NOV said in a statement Monday.

Commenting on the award to ALP, Hans Hoegh-Omdal, Vice President, Turret, Mooring, & Surf Group for BW Offshore (BWO) said: "BWO has worked with APL on numerous FPSO projects over the years, the latest being our successful Catcher FPSO project. With APL’s first-class turret technology and our successful cooperation in the past, it was easy for BWO to turn to APL for their assistance for the Barossa project.”

Initial gas production from the FPSO is expected during the first half of 2025.

Categories: Technology Energy Subsea Activity Production Floating Production Australia/NZ Mooring

Related Stories

Pharos Energy Kicks Off Drilling Campaign Offshore Vietnam

US Pressure on India Could Propel Russia's Shadow Oil Exports

Vietsovpetro Brings BK-24 Oil Platform Online Two Months Early

Timor Gap Boosts Stake in Finder Energy’s Timor-Leste Oil Fields

Brownfield Output Decline Accelerates, says IEA

Saipem Bags $1.5B Contract for Türkiye Largest Offshore Gas Field

Floating Offshore Wind Test Center Planned for Japan

Synergy Marine Group Completes Conversion of LNG Vessel to FSRU

CNOOC Brings New Offshore Gas Field On Stream

China Starts Production at Major Oil Field in Bohai Sea

Current News

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

PTTEP Orders OneSubsea Systems for Two Deepwater Projects off Malaysia

Russia's Lukoil Takes Up Gunvor’s Offer for Foreign Assets

How Hot Is Your Cable? Understanding Subsea Cable Thermal Performance

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

Pertamina Joins Petronas in Ultra-Deepwater Asset off Indonesia

Malaysia’s Petronas and Oman’s OQEP Strengthen Oil and Gas Ties

Southeast Asia’s 2GW Cross-Border Offshore Wind Scheme Targets 2034 Buildout

Pharos Energy Kicks Off Drilling Campaign Offshore Vietnam

Viridien to Shed More Light on Malaysia’s Offshore Oil and Gas Potential

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com