BW Offshore Taps NOV's APL for Barossa FPSO STP System

OE Staff
Tuesday, May 11, 2021

FPSO specialist BW Offshore has awarded NOV's APL a contract to supply a large submerged turret production (STP) system for the FPSO to be deployed at Santos' Barossa gas and condensate field located offshore of Australia.

The Barossa field is located about 186 miles (300 kilometers) northwest of Darwin in the Timor Sea, with water depths ranging from 720 to 920 feet (220 meters and 280 meters).

The $3.6 billion Barossa development, sanctioned by Santos in March, consists of infield subsea infrastructure tied back to the centrally located FPSO.

The FPSO will process high-pressure reservoir fluids for gas export to the Darwin liquefied natural gas (LNG) facility via a 180-mile (290-kilometer) subsea pipeline for condensate storage and offloading.

The Barossa FPSO will be a new, purpose-built vessel equipped with an APL STP system, which provides permanent mooring and connection to subsea facilities. The FPSO is designed for a 25-year life of uninterrupted operation without drydocking. APL is part of NOV's Completion & Production Solutions business.

"Our STP system is a unique, innovative, and flexible turret mooring system for FPSOs. The system includes our STP swivel, which is designed for high pressures, temperature, and volumes, and the system transfers all fluids, signals, and power between the subsea system and the freely weathervaning production vessel," NOV said in a statement Monday.

Commenting on the award to ALP, Hans Hoegh-Omdal, Vice President, Turret, Mooring, & Surf Group for BW Offshore (BWO) said: "BWO has worked with APL on numerous FPSO projects over the years, the latest being our successful Catcher FPSO project. With APL’s first-class turret technology and our successful cooperation in the past, it was easy for BWO to turn to APL for their assistance for the Barossa project.”

Initial gas production from the FPSO is expected during the first half of 2025.

Categories: Technology Energy Subsea Activity Production Floating Production Australia/NZ Mooring

Related Stories

AI & Offshore Energy: The Higher the Stakes, the More Value AI Creates

Valeura Boosts Production at Jasmine Field with Five New Wells Now Onstream

Makin' a List ... Trump Prioritizes Energy Exploration, Production, Export

Global OTEC Presents OTEC Power Module for Remote Offshore Platforms

Beam’s AI-Driven AUV to Hit Offshore Wind Market in 2025

CRC Evans Secures Work at Qatar’s Largest Offshore Oil Field

SBM Offshore’s FPSO for ExxonMobil’s Guyana Oil Project Takes Final Shape (Video)

OPEC+ Has Oil Price and Demand Problems. It Should Solve Demand

Santos Pens Mid-Term LNG Supply Deal

IK Group Spins Off Norclamp

Current News

Offshore Service Vessels: What’s in Store in 2025

ABS Approves Hanwha Ocean’s FPSO Design

AI & Offshore Energy: The Higher the Stakes, the More Value AI Creates

Floating LNG Conversion Job Slips Out of Seatrium’s Hands

Transocean’s Drillship to Stay in India Under New $111M Deal

INEOS Picks Up CNOOC’s US Assets in $2B Deal

Sunda Energy, Timor-Leste Gov Plan Accelerated Chuditch Gas Development

RINA to Conduct Pre-FEED Study for Petronas’ CCS Project in Malaysia

TotalEnergies Wraps Up Acquisition of SapuraOMV’s Gas Assets

Kuwaiti Oil and Gas Firm Exploring More Opportunities in Indonesia's Natuna Sea

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com