BW Offshore Taps NOV's APL for Barossa FPSO STP System

OE Staff
Tuesday, May 11, 2021

FPSO specialist BW Offshore has awarded NOV's APL a contract to supply a large submerged turret production (STP) system for the FPSO to be deployed at Santos' Barossa gas and condensate field located offshore of Australia.

The Barossa field is located about 186 miles (300 kilometers) northwest of Darwin in the Timor Sea, with water depths ranging from 720 to 920 feet (220 meters and 280 meters).

The $3.6 billion Barossa development, sanctioned by Santos in March, consists of infield subsea infrastructure tied back to the centrally located FPSO.

The FPSO will process high-pressure reservoir fluids for gas export to the Darwin liquefied natural gas (LNG) facility via a 180-mile (290-kilometer) subsea pipeline for condensate storage and offloading.

The Barossa FPSO will be a new, purpose-built vessel equipped with an APL STP system, which provides permanent mooring and connection to subsea facilities. The FPSO is designed for a 25-year life of uninterrupted operation without drydocking. APL is part of NOV's Completion & Production Solutions business.

"Our STP system is a unique, innovative, and flexible turret mooring system for FPSOs. The system includes our STP swivel, which is designed for high pressures, temperature, and volumes, and the system transfers all fluids, signals, and power between the subsea system and the freely weathervaning production vessel," NOV said in a statement Monday.

Commenting on the award to ALP, Hans Hoegh-Omdal, Vice President, Turret, Mooring, & Surf Group for BW Offshore (BWO) said: "BWO has worked with APL on numerous FPSO projects over the years, the latest being our successful Catcher FPSO project. With APL’s first-class turret technology and our successful cooperation in the past, it was easy for BWO to turn to APL for their assistance for the Barossa project.”

Initial gas production from the FPSO is expected during the first half of 2025.

Categories: Technology Energy Subsea Activity Production Floating Production Australia/NZ Mooring

Related Stories

COSL Places $1.64B Order for 59 Offshore Support Vessels

When Contractors Collide: Keeping Offshore Energy Projects on Schedule

Iran Brings South Pars Gas Platform Fire Under Control

Strohm Nets Ultra-Deepwater Supply Deal for Southeast Asia’s Gas Scheme

Indonesia Cuts Singapore Pipeline Gas Flows by 9% to Meet Domestic Demand

Idemitsu Taps PV Drilling for Vietnam's Offshore Drilling Campaign

Indonesia's Jangkrik FPU Set for Major Gas Output Boost

Oil India Discovers Gas in Shallow Waters of Krishna-Godavari Basin

Oil Climbs on US Storm Threat, Saudi Attack Risks

Fugro Adds More Survey Work off Timor-Leste

Current News

Petronas Names ‘World's First’ Nearshore FLNG Facility

Oil Falls as Supply Glut Concerns Overshadow Hormuz Shipping Risks

Masirah Oil Delays Yumna Production as Drilling Progresses off Oman

Searah Starts Production from New Bukit Tua Well Offshore Indonesia

NMDC Energy to Acquire Wasco’s Engineering Division for $190M

China’s COOEC Lands $800M QatarEnergy Subsea Contract

Oil Prices Rise as Houthi Strikes Revive Supply Disruption Fears

COSL Places $1.64B Order for 59 Offshore Support Vessels

When Contractors Collide: Keeping Offshore Energy Projects on Schedule

Floating Production Outlook: Pipeline Looks Huge, But Not All Projects Are Created Equal

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com