Jadestone Energy Lifts Malaysia Production with Second Online Well

Monday, July 20, 2026

Jadestone Energy has brought the second well in its 2026 Malaysia infill drilling campaign onstream at 2,800 barrels of oil per day (bpd), extending the program that has increased production from the East Belumut field by more than 150%, or about 6,000 bpd.

The second well, EBA-07ST1, follows the first campaign well, EBA-18ST3, which was brought online in June at a peak production rate of about 3,200 bpd.

EBA-07ST1 was drilled about 13% below budget and includes a 930-metre horizontal reservoir section at a total measured depth of 5,473 meters.

Jadestone said it is the longest well drilled to date on the East Belumut field, where it holds a 60% interest, exceeding the first well in the campaign by 600 meters. With an extended reach drilling ratio of 4.1, the well also set a new Malaysia record for extreme reach drilling.

The first well, EBA-18ST3, was drilled about 20% below budget and featured a 1,200-metre horizontal reservoir section at a total measured depth of 4,866 meters. It was originally the longest well drilled on the field before being surpassed by EBA-07ST1.



The 2026 drilling program initially comprised two firm wells and a third contingent well targeting the southwest extension of the East Belumut field identified during the 2023 infill campaign. Jadestone decided to proceed with the third well following the performance of the first well and subsurface data gathered while drilling the second.

The company said drilling and completion activities on the third well have now been completed, with results to be reported in due course.

“Following on from the excellent results of the first well in the 2026 East Belumut campaign, the second well has delivered a similarly positive outcome. It sets a new record for extended reach drilling across all basins in Malaysia, a very impressive milestone by our drilling team.

“In aggregate, the first two wells have increased production from the field by over 150% (an increase of ~6,000 bopd) – further validating our proven capability to unlock reserves, and create value in existing fields, by identifying and executing on opportunities bypassed by previous operators. We look forward to updating the market on the third well in the near future,” said T. Mitch Little, Chief Executive Officer of Jadestone.

Categories: Drilling Industry News Activity Production Asia Oil and Gas

Related Stories

Yinson Production Raises $1.46B to Refinance Agogo FPSO

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

Arabian Drilling Inks $533M Deal for Four Jack-Up Drilling Rigs

Eni and Petronas JV Extend Drilling Backlog for Ventura Offshore’s Semi-Sub Rig

ONGC Strikes Gas in Deepwater Well off India

SED Energy Holdings and Ventura Offshore Set to Combine Ops

PTTEP, Petronas Ink 35-Year Malaysia-Thailand Gas Deals

BP Completes Central Azeri Platform Maintenance, Ramps Up Production

Borr Drilling's Mexican JV Expands Fleet with Five Jack-Ups

Current News

Valeura Starts Wassana Platform Installation Offshore Thailand

Oil Stabilizes as IEA Moves to Speed Up Emergency Stock Releases

Yinson Production Raises $1.46B to Refinance Agogo FPSO

Oil Climbs on US Storm Threat, Saudi Attack Risks

KBR to Support Aramco’s Marjan Offshore Field Upgrade

Oil Industry Braces for Years of Market Disruption

Eni Taps Yinson Production for Major Ghana FPSO Gas Upgrade

ADNOC Signs Multi-Year LNG Supply Deal with Thailand’s Gulf Group

Iran Set to Keep Hormuz Shut Until Seven Demands Are Met

LNG Flows Through Hormuz Hit Seven-Month High

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com