Gazprom Starts Construction of Arctic Offshore Platform

Friday, June 26, 2020

Construction of Gazprom's ice-resistant offshore production platform for the development of the Kamennomysskoye-Sea field began Thursday at the shipyard of Southern Shipbuilding and Repair Center (part of United Shipbuilding Corporation) in the Astrakhan Region.

The Kamennomysskoye-Sea gas field is located in the Ob Bay of the Kara Sea where temperatures can drop to minus 60 degrees Celsius.

"The field is unique in terms of its gas reserves, which amount to some 555 billion cubic meters. Production operations are due to commence in 2025, with a design output (for Cenomanian deposits) of 15 billion cubic meters per year," Gazprom said.

The field is situated in a marine environment characterized by low temperatures, heavy storms, shallow depths (5–12 meters), and thick and dense freshwater ice, Gazprom said.

"The development of this field will become the first shelf project in the world to be implemented in such extreme ice and climate conditions," Gazprom said.

Gazprom is now building a special ice-resistant platform for the development of the field. The platform will be more than 135 meters long, 69 meters wide, 41 meters tall from the base to the helicopter pad, and its weight will exceed 40,000 tons in total. 

The structures placed on the platform will include, inter alia, main and auxiliary drilling modules, operational and energy complexes, and living quarters for 120 people. 

The ice-resistant platform will be used to build 33 main directional production wells (later on, another 22 wells for maintaining production rates will be placed on satellite ice-resistant conductor platforms that do not require the permanent presence of personnel). The extracted gas will be fed into pipelines and arrive onshore into a comprehensive gas treatment unit and a booster compressor station. After that, the gas will go into Russia's Unified Gas Supply System.

The platform will be firmly fixed on the muddy bottom of Ob Bay with the help of a piled gravity base foundation: the platform will be placed on the seabed, the underwater part will be filled with seawater and then fixed in place with 56 piles more than 2 meters in diameter, driven 47 meters into the seabed.

Separate components of the platform will be simultaneously put together in Astrakhan, Kaliningrad, Severodvinsk, Yekaterinburg, and Rybinsk. The platform will be finally assembled in one piece in Kaliningrad.

"In the summer navigation period of 2024, it is planned to tow the [ice-resistant platform ] to the field, after which flare booms and a helicopter pad will be set up at the facility. Construction operations will involve about 7,000 Russian workers and specialists."
 

Categories: Arctic Production Platform Energy Russia Activity

Related Stories

Woodside and Jera Agree LNG Cargoes Supply for Japan’s Winter Period

Woodside Agrees Long-Term LNG Supply with Petronas Unit

Petronas-Eni Upstream Joint Venture to Take Up to Two Years to Set Up

Wood JV Gets EPC Job for Shell off Brunei

Chuditch Gas Field Drilling Ops Get Delayed to Next Year

UK Firm Secures Exploration Extension for Two Blocks off Vietnam

Aker Solutions, PTAS JV Hooks Brownfield Services Extension off Brunei

Woodside to Shed Some Trinidad and Tobago Assets for $206M

CNOOC Starts Production at Two New Oil and Gas Projects

All Gas from Conrad’s Mako Field to be Sold to Indonesia’s PLN

Current News

Woodside and Jera Agree LNG Cargoes Supply for Japan’s Winter Period

Petronas Expands Suriname Portfolio with Deepwater Block Acquisition

Japanese Oil and Gas Firm Enters Two Blocks off Malaysia

Yinson Production, “K” LINE Target Europe's CCS with FSIU and LCO2 Solutions

Woodside Agrees Long-Term LNG Supply with Petronas Unit

MODEC and Terra Drone Renew FPSO Drone Inspection Partnership

Yinson Production Closes $1B Investment to Drive Further Growth

Petronas-Eni Upstream Joint Venture to Take Up to Two Years to Set Up

Wood JV Gets EPC Job for Shell off Brunei

Chuditch Gas Field Drilling Ops Get Delayed to Next Year

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com