Chevron Files Plans for Subsea Infrastructure Expansion at Gorgon

Monday, June 15, 2020

Chevron has filed an environment plant to Australian regulators related to the expansion of the subsea gathering network within the existing Gorgon and Jansz–Io offshore gas fields in Australia.

Chevron Australia is the operator of the giant Gorgon project, which included the construction of an LNG Plant and domestic gas plant on Barrow Island.

To maintain gas supply for the three-train Gorgon LNG Plant, Chevron plans to expand the subsea gathering network within the existing Gorgon and Jansz–Io fields. This involves a drilling campaign, installing additional subsea manifolds to accommodate the new wells, and infield flowlines to tie into the existing subsea infrastructure.

The Jansz–Io gas fields are located within production licenses WA‐36‐L, WA‐39‐L and WA‐40‐L approximately 200 km off the north‐west coast of Western Australia in water depths of approximately 1,350 m. 

The Gorgon gas field is located within production Licences WA‐37‐L and WA‐38‐L, approximately 130 km off the north‐west coast of Western Australia, and 65 km north‐west of Barrow Island in water depths of approximately 200 meters. 

As part of the subsea gathering network expansion project, Chevron plans to install infield flowlines, pipelines, and umbilicals, subsea structures, jumpers, and tie-in spools, and flying leads.

Included in the project are leak testing and pre-commissioning, field suspension, inspection, maintenance, and repair (IMR) (before start-up and operations start), support operations.

Installation of pipelines, flowlines, and subsea infrastructure is expected to start in Q4 2020, at the earliest, and be completed within approximately 24 months. Construction activities will begin with site preparation and pipelay, followed by structure, spool, and jumper installation.


Categories: Energy LNG Subsea Pipelines Industry News Activity Natural Gas Australia/NZ

Related Stories

Gastech 2026 to convene global energy leaders in Bangkok as Asia accelerates demand, LNG investment and system transformation

Hormuz Reopening Risks Turning Oil Shortage Into Glut

Yinson Production Names FSO for Murphy's Lac Da Vang Project off Vietnam

Inpex, Unions Reach Deal to End Ichthys LNG Strike

TGS Books 3D Streamer Seismic Job in Africa and Middle East region

ADNOC Looks to Canada for Upstream and LNG Growth Through XRG

Petronas Signs 20-Year LNG Supply Deal with Japan's JERA

Ichthys LNG Strike Intensifies as Union Talks with Inpex Collapse

SBM Offshore to Sell 45% Stake in Mexico-Bound FSO to NYK

Inpex Faces Threat of Broad LNG Loading Ban as AU Labour Dispute Deepens

Current News

ADNOC Launches Global LNG Trading Powerhouse

Gastech 2026 to convene global energy leaders in Bangkok as Asia accelerates demand, LNG investment and system transformation

TotalEnergies Sells Malaysia Offshore Gas Field Stake to Inpex

MODEC Advances Construction of Brazil-Bound Gato do Mato FPSO

Oil Hits Four-Month Low After US-Iran Doha Talks

SLB to Support Kuwait Oil's AI and Digital Tech Initiative

Sunda Reviews Timor-Leste Appraisal Plans as New Zealand Deal Advances

TGS Gets Exclusive Rights for Seismic Survey Offshore Brunei

Petronas Unit Probes Cause of Fire at Offshore Platform in Malaysia

SBM Offshore, SWS Sign Deal for Seventh FPSO Hull

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com