Yinson, Petrobras Sign Firm Contracts for Marlim 2 FPSO

Bartolomej Tomic
Monday, March 30, 2020

Malaysian FPSO provider Yinson has signed firm contracts with Petrobras for the delivery and for operation and maintenance of the Marlim 2 FPSO.

The two companies had in October 2019 signed letters of intent for the long-term charter and operation of the FPSO to be deployed at Petrobras’ Marlim field in the Campos Basin.

Yinson has, a couple of days ago, confirmed that its subsidiaries Yinson Production Pte Ltd, Yinson Boronia Production B.V., and Yinson Boronia Serviços de Operação Ltda, on March 23, 2020, entered into the definitive contracts Petrobras for the Marlim 2, under the same terms as stipulated by the letters of intent signed in October 2019.

The date of final acceptance of the FPSO under the contracts is expected in the first quarter of 2023. 

"Marlim 2 FPSO is expected to commence operation by the first quarter of 2023 upon achieving final acceptance," Yinson said, adding there was no extension of the term of the charter under the contracts.

As announced in October 2019, the term of the charter is 9,125 days or approximately 25 years from the date of final acceptance of Marlim 2 FPSO.

The estimated aggregate value of the contracts – both for delivery and operations and maintenance - is around $5.4 billion

The FPSO will be installed around 150 km off the Brazilian coast, in a water depth of around 930 meters. The Marlim 2 FPSO will have the capacity to process up 70,000 bpd of oil and 4 million m³/ of natural gas. This will be Yinson's first FPSO in Brazil.

In the wake of the recent crash in oil price and coronavirus challenges, Yinson said its management was cautiously confident in the group's ability to stay resilient through the challenges, "reflected in part by our successful bid in Brazil for the FPSO Marlim 2 project, letter of intent recently secured for the provision of an FPSO in Ghana [with Aker Energy]and the recent successful deployment of FPSO Helang, together with other potential upcoming projects in the pipeline."


Categories: Activity FPSO Production Floating Production Deepwater Malaysia

Related Stories

When Contractors Collide: Keeping Offshore Energy Projects on Schedule

Floating Production Outlook: Pipeline Looks Huge, But Not All Projects Are Created Equal

First Oil Flows from Vietsovpetro's Platform Offshore Vietnam

Baker Hughes Sets Up Global Network to Bolster Mature Oil and Gas Fields Production

Eni, Petronas JV Brings Indonesian Offshore Gas Field Online

Strohm Nets Ultra-Deepwater Supply Deal for Southeast Asia’s Gas Scheme

Indonesia's Jangkrik FPU Set for Major Gas Output Boost

Eni Agrees Indonesian Gas Asset Sales to Pertamina and Medco

SLB Secures Aramco Well Construction Work for 450 Wells

ONGC Strikes Gas in Deepwater Well off India

Current News

NMDC Energy to Acquire Wasco’s Engineering Division for $190M

China’s COOEC Lands $800M QatarEnergy Subsea Contract

Oil Prices Rise as Houthi Strikes Revive Supply Disruption Fears

COSL Places $1.64B Order for 59 Offshore Support Vessels

When Contractors Collide: Keeping Offshore Energy Projects on Schedule

Floating Production Outlook: Pipeline Looks Huge, But Not All Projects Are Created Equal

Shell Brings Deepwater Gas Fields Onstream off Malaysia

Hanwha Power Secures FSRU Conversion Deal with Energos

Orlen's Termination of Qatar LNG Deal Could Yield $2B in Savings

Oil Heads for Weekly Decline Despite Middle East Supply Threats

Magazine

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com