Husky Energy Delays Projects, Cuts Upstream Capex by $900M

OE Staff
Friday, March 13, 2020

Canadian oil and gas company has cut its CAPEX and production guidance for 2020 amid the volatile oil market environment. The cuts will be made in its upstream business with projects put on hold in China, Indonesia, and Canada.

The company has slashed its 2020 capital program reduced by $900 million; represents 33% reduction in upstream spending. 

Husky Energy now expects to spend between $1,75 billion and $1,9 billion in the upstream segment in 2020, down from previously planned $2,6 billion and 2,8 billion range. Apart from CAPEX cuts, the company is also looking at $100 million in additional cost-saving measures.

“Husky has three important advantages: a strong balance sheet, an Integrated Corridor which includes a sizeable downstream and midstream segment, and Offshore operations that include long-term gas contracts in the Asia Pacific region not linked to the price of oil,” said CEO Rob Peabody.

"Given current market conditions Husky will commence the safe and orderly reduction, or shut-in, of production where it is cash negative on a variable cost basis at current prices," the company said.

In the Asia Pacific region, the development of the Block 15/33 oil field offshore China has been deferred by a year. In Indonesia, Husky has deferred the development of the MDA-MBH natural gas field.

The Liuhua 29-1 field at the Liwan Gas Project in China is not affected by the capital cuts and is being advanced as planned, with the first production expected by the end of 2020.

As part of the cuts, spending in resource plays and conventional heavy oil projects in Western Canada has been halted, with a focus on optimizing existing production and lowering costs. Drilling of sustaining pads at all thermal operations has been suspended.

Also, Lloydminster thermal projects scheduled to be delivered beyond 2020 have been deferred and will be reconsidered as market conditions improve.

"The Company continues to review further capital adjustments in response to the current market environment. Additional cost reduction initiatives totaling approximately $100 million in 2020 will include a reduction in well-servicing activities on uneconomic production, and a halt in exploration activity," Husky said.

Categories: Finance Energy Drilling Activity Production Asia North America Canada Exploration China Indonesia

Related Stories

Pharos Energy Kicks Off Drilling Campaign Offshore Vietnam

Energy Drilling’s EDrill-2 Rig Starts Ops for PTTEP in Gulf of Thailand

Ventura Offshore’s Semi-Sub Rig to Keep Drilling for Eni in Asia

PV Drilling Takes Ownership of Noble Corporation’s Stacked Jack-Up Rig

Saipem Wins FEED Contract For Abadi LNG Project FPSO Module In Indonesia

CNOOC Finds Oil and Gas in South China Sea

Seatrium Makes First Turnkey FPSO Delivery to Petrobras

PTTEP Hires Energy Drilling’s Rig for Southeast Asia Offshore Job

Four Jack-Up Drilling Rig Deals Set to Bring In $129M for Borr Drilling

PTTEP Hires Velesto’s Jack-Up Rig for Drilling Campaign off Malaysia

Current News

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

Pertamina Joins Petronas in Ultra-Deepwater Asset off Indonesia

Malaysia’s Petronas and Oman’s OQEP Strengthen Oil and Gas Ties

Southeast Asia’s 2GW Cross-Border Offshore Wind Scheme Targets 2034 Buildout

Pharos Energy Kicks Off Drilling Campaign Offshore Vietnam

Viridien to Shed More Light on Malaysia’s Offshore Oil and Gas Potential

US Pressure on India Could Propel Russia's Shadow Oil Exports

Energy Drilling’s EDrill-2 Rig Starts Ops for PTTEP in Gulf of Thailand

RINA Wins FEED Contract for Petronas’ Flagship CCS Project in Malaysia

ABL Secures Rig Moving Assignment with India's ONGC

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com