Husky Energy Delays Projects, Cuts Upstream Capex by $900M

OE Staff
Friday, March 13, 2020

Canadian oil and gas company has cut its CAPEX and production guidance for 2020 amid the volatile oil market environment. The cuts will be made in its upstream business with projects put on hold in China, Indonesia, and Canada.

The company has slashed its 2020 capital program reduced by $900 million; represents 33% reduction in upstream spending. 

Husky Energy now expects to spend between $1,75 billion and $1,9 billion in the upstream segment in 2020, down from previously planned $2,6 billion and 2,8 billion range. Apart from CAPEX cuts, the company is also looking at $100 million in additional cost-saving measures.

“Husky has three important advantages: a strong balance sheet, an Integrated Corridor which includes a sizeable downstream and midstream segment, and Offshore operations that include long-term gas contracts in the Asia Pacific region not linked to the price of oil,” said CEO Rob Peabody.

"Given current market conditions Husky will commence the safe and orderly reduction, or shut-in, of production where it is cash negative on a variable cost basis at current prices," the company said.

In the Asia Pacific region, the development of the Block 15/33 oil field offshore China has been deferred by a year. In Indonesia, Husky has deferred the development of the MDA-MBH natural gas field.

The Liuhua 29-1 field at the Liwan Gas Project in China is not affected by the capital cuts and is being advanced as planned, with the first production expected by the end of 2020.

As part of the cuts, spending in resource plays and conventional heavy oil projects in Western Canada has been halted, with a focus on optimizing existing production and lowering costs. Drilling of sustaining pads at all thermal operations has been suspended.

Also, Lloydminster thermal projects scheduled to be delivered beyond 2020 have been deferred and will be reconsidered as market conditions improve.

"The Company continues to review further capital adjustments in response to the current market environment. Additional cost reduction initiatives totaling approximately $100 million in 2020 will include a reduction in well-servicing activities on uneconomic production, and a halt in exploration activity," Husky said.

Categories: Finance Energy Drilling Activity Production Asia North America Canada Exploration China Indonesia

Related Stories

ADNOC Looks to Canada for Upstream and LNG Growth Through XRG

Velesto’s Jack-Up Rig Up for Gulf of Thailand Drilling Campaign

Kuwait Sees 70% Oil Output Recovery within Two Months of Hormuz Reopening

Oil Prices Edge Lower Amid Uncertainty Over US-Iran Deal

Iran Restarts Output at Three South Pars Offshore Gas Platforms

Velesto Secures Malaysia Drilling Deal with Hibiscus

Yinson Production, PTSC Raise Over $130M for Vietnam’s Block B FSO

Dolphin Drilling Boosts Backlog with Harbour Energy Deal, Oil India Extension

ADNOC Drilling Posts Record First-Quarter Results with 5% Revenue Rise

Brent Near $114 as Middle East Conflict Continues

Current News

RINA Gets Safety Assessment Role on Indonesia's H2WATT Hydrogen Hub

IEA Expects Gradual Hormuz Recovery, Oversupplied Market in 2027

Inpex, Unions Reach Deal to End Ichthys LNG Strike

Gulf Marine Services Restarts Ops of Evacuated Gulf Vessels

Japan’s Shipping Industry Awaits Clarifications on Hormuz Reopening

Oil Slumps as US-Iran Reach Initial Peace Deal to Reopen Strait of Hormuz

JERA Takes Delivery of First LNG Cargo from Australia's Barossa Gas Project

Inpex’s Ichthys LNG Strike Persists as Fair Work Hearing Gets Postponed

Oil Falls More Than 2% as US-Iran Tensions Ease

TGS Books 3D Streamer Seismic Job in Africa and Middle East region

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com