Tanzania Builds $30bn LNG Project

Shailaja A. Lakshmi
Sunday, July 28, 2019

Dr Medard Kalemani, Tanzania’s Minister of Energy, has confirmed the recently announced plans for a syndicate of oil companies to commence construction of the $30bn LNG project in 2022.

In March, the government stated that it planned to complete negotiations with a group of international oil companies in September to develop the project.

Led by Norwegian energy firm, and Platinum Sponsor of the Congress, Equinor, the group also consists of Royal Dutch Shell, ExxonMobil, Ophir Energy and Pavilion Energy.

These international companies will work closely on the project, alongside the state-run Tanzania Petroleum Development Corporation (TPDC).

In a budget presentation to parliament, the Honorable Minister stated that the project aims conclude in 2028 and will have capacity to produce 10 million tonnes per annum of LNG.

Currently, each individual investor of the project is holding separate talks with the government negotiation team. These talks are expected to be finalized within seven months.

According to the Bank of Tanzania, work on the project will increase annual economic growth, which currently stands at around 7%, by another two percentage points.

Categories: Energy LNG Government Update Terminal

Related Stories

Fire at Petronas Gas Pipeline in Malaysia Sends 63 to Hospital

Woodside to Shed Some Trinidad and Tobago Assets for $206M

Woodside Inks Long-Term LNG Supply Deal with China Resources

Japan and South Korea Look to Partner Up with US for Alaska Pipeline

Eco Wave Finds Partner for Wave Energy Project in India

Six New Gas Wells in Line for BP’s Shah Deniz Field in Caspian Sea

CNOOC Starts Production at Offshore Oil Filed Equipped with CCUS Tech

McDermott Concludes Work at PTTEP’s Kikeh Gas Field Off Malaysia

EnQuest to Acquire Harbour Energy's Vietnamese Assets

Saipem’s Castorone Vessel on Its Way to Türkiye’s Largest Gas Field

Current News

Shell-Reliance-ONGC JV Complete India’s First Offshore Decom Project

The Future of Long-Idle Drillships: Cold-Stacked or Dead-Stacked?

TMC Books Compressors Orders for FPSO and LNG Vessels

MODEC, Sumitomo Partner Up for Delivery of Gato do Mato FPSO

Chuditch Gas Field Up for Summer Drilling Ops as Sunda Reshapes Ownership Structure

EnQuest Bags Two Production Sharing Contracts off Indonesia

Hanwha Drilling’s Tidal Action Drillship En Route to Petrobras’ Roncador Field

China's ENN, Zhenhua Oil Ink LNG Supply Deals with ADNOC

MODEC Wins ExxonMobil Guyana’s Hammerhead FPSO Contract

India Stretches Bids Deadline for 13 Offshore Deep-Sea Mineral Blocks

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com