First LNG Bunker Vessel Coming in 2020

Posted by Michelle Howard
Monday, June 10, 2019

Wärtsilä was tapped to supply an integrated package of sustainable solutions for China’s first seagoing LNG bunker vessel, scheduled for delivery in 2020.

The ship is being built by the Dalian Shipbuilding Industry Corporation (DSIC) for an affiliate of the ENN Energy holdings, one of the largest users of LNG in China. It has been designed by China Ship Design & Research Center Co. Ltd. Wärtsilä will provide the vessel’s cargo handling system, the Wärtsilä 34DF dual-fuel main engine, the gearbox, controlled pitch propeller (CPP), shaft generator, two Wärtsilä 20DF dual-fuel auxiliary engines, and the ship’s sewage treatment plant. The integrated gas, propulsion, and waste treatment systems are designed to deliver high efficiency with stable and clean operations. The equipment is scheduled for delivery in early 2020.

The 8500 cu. m. capacity vessel is the first newbuilding LNG bunkering vessel for ENN Energy Holdings and is part of the Group’s ambition to play an active role in the international marine LNG fuel supplier market. With this bunker vessel, ENN will be capable of supplying fuel to the world’s biggest LNG fueled vessels.

Categories: Technology Shipbuilding LNG Propellers Energy

Related Stories

Eni Enlists OneSubsea for Deepwater Umbilical Supply off Indonesia

ONGC Plans Major New Indian Oil Reserve

ADNOC, XRG and Mitsui Broaden Energy Cooperation

Markets: Oil Majors Reload Exploration Hoppers Across Sub-Saharan Africa

Walking Into the Future: ADNOC Drilling Unveils First AI-Powered Island Rig

Yinson Production Names FSO for Murphy's Lac Da Vang Project off Vietnam

Explosion at Qatar's Ras Laffan LNG Hub Injures 54, Leaves 18 Missing

JERA Takes Delivery of First LNG Cargo from Australia's Barossa Gas Project

Aramco Picks McDermott for Energy Projects in Saudi Arabia

Ichthys LNG Strike Causes Delay to Taiwan-Bound Cargo

Current News

Eni Enlists OneSubsea for Deepwater Umbilical Supply off Indonesia

EnQuest Clears Key Hurdle for $833M Malaysia Offshore Deal

ONGC Plans Major New Indian Oil Reserve

LNG Tankers Resume Hormuz Crossings Amid Tensions

Hormuz Standoff Risks Chronic Instability for Gulf Oil Flows

From Fixtures to Values: Where the Jackup Recovery Is Already Being Priced

Eni and Petronas JV Extend Ventura Offshore’s Drilling Job in Indonesia

Dolphin Drilling’s Blackford Dolphin Secures More Work for Oil India

Oil Surges 3% on Renewed US-Iran Strikes

Offshore Vessel Pair Ordered from Grandweld Shipyard

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com