Seismic Surveys Delayed in US Arctic

By Yereth Rosen
Monday, February 11, 2019

There will be no seismic exploration this winter on the coastal plain of the Arctic National Wildlife Refuge, the Interior Department said on Friday, after the company seeking permission to conduct the tests ran out of time to get the required permit.

"We can confirm that seismic surveys will not take place until December 2019," said Alex Hinson, U.S. Department of the Interior spokesman, in an email.

The company applying for the permits, SAExploration, had applied for a start date as early as December 2018 for seismic testing as a precursor to drill in the ANWR, which has been off-limits to drillers for decades.

The application remains active, but will be altered. "The applicant has asked us to amend both permits to reflect a December 2019 start date, and it should be coming out in the coming weeks," Hinson said.

Congress opened up the Arctic territory for oil leasing as part of the tax bill that passed in late 2017.

Environmental groups fiercely oppose oil development on the refuge’s coastal plain. The tax bill included a provision championed by Alaska Senator Lisa Murkowski that requires lease sales in the refuge coastal plain.

Drilling opponents even oppose the 3-D seismic work that SAExploration plans, which would involve sending vehicles on the refuge’s tundra and shooting loud sound waves into the ground to try to delineate geologic structures.

Critics say that would harm wildlife, particularly polar bear mothers in dens with their cubs. Because of expected impacts to polar bears, SAExploration needs a special authorization from the U.S. Fish and Wildlife Service, a permit that the company has not yet received.

Industrial travel across the Alaska North Slope tundra is allowed only in winter when the soil is frozen hard and covered by what is considered to be a sufficiently protective snow layer.

Lisa Baraff, program director with the Fairbanks-based Northern Alaska Environmental Center, said her organization did not know why SAExploration’s seismic project is on hold until at least next winter.

“It could be a combination of the government shutdown thing, plus some concerns that are very real, such as the potential for impacts to polar bears,” Baraff said.

The Trump administration is reviewing options for leasing, with plans to hold the first lease sale this year.


(Reporting by Yereth Rosen in Anchorage, Alaska; Editing by David Gregorio)

Categories: Legal Environmental Surveyors Geoscience North America Regulations Geophysics Geology Seismic

Related Stories

Keel Laying for Wind Flyer Trimaran Crew Boat

ORE Catapult and Japan’s FLOWRA to Jointly Advance Floating Wind

Japan and South Korea Look to Partner Up with US for Alaska Pipeline

Six New Gas Wells in Line for BP’s Shah Deniz Field in Caspian Sea

Malaysia's Petronas Plans Job Cuts

Petronas Preps for Sabah-Sarawak Gas Pipeline Decom Op

AIRCAT 35 Crewliner Vessels Delivered to Service TotalEnergies Angola

Europe's Gas Uncertainty Help Drive Asian LNG Spot Prices Higher

Flare Gas Recovery Meets the Future

Floating LNG Conversion Job Slips Out of Seatrium’s Hands

Current News

CNOOC Makes Major Oil and Gas Discovery in South China Sea

Valeura’s Assets in Gulf of Thailand Remain Operational After Earthquake

Op-Ed: Kazakhstan’s National O&G Firm Positioning Itself as Global Energy Player

Woodside to Shed Some Trinidad and Tobago Assets for $206M

CNOOC Sees 11% Profit Growth in 2024 Driven by Record Oil Production

‘Ultra-Mega’ Offshore Deal for L&T at QatarEnergy LNG’s North Field Gas Scheme

Keel Laying for Wind Flyer Trimaran Crew Boat

MODEC Gets Shell’s Gato do Mato FPSO Ops and Maintenance Job

EnerMech Names APAC Regional Chief

CIP Reaches Financial Close for Offshore Wind Farm in Taiwan

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com