Santos Boosts Van Gogh Production

Tuesday, January 22, 2019

Australian producer Santos announced Tuesday that it has achieved first oil from the Van Gogh infill project, marking the completion of a two-well program to increase production from the field.

The Santos-operated Van Gogh field is one of three subsea oil field developments located in the Exmouth Basin, offshore Western Australia, which tie into the floating production, storage and offloading vessel (FPSO), the Ningaloo Vision.

The infill project began in September and involved drilling and completing two subsea wells and connecting them into existing offshore infrastructure.

The two dual-lateral wells were targeted to access bypassed oil not drained from the original wells and were technically the most challenging of any wells in the development, drilling horizontal sections in the reservoirs as long as 3,500 meters only 950 meters below the seabed.

Production from Van Gogh began in 2010, with the nearby Coniston and Novara fields tied back to the FPSO in 2015 and 2016, respectively.

Santos has a 52.5 percent interest in the Van Gogh-Coniston-Novara project, which it operates.

Categories: Offshore Energy Subsea Activity FPSO Production Floating Production

Related Stories

SLB Secures Aramco Well Construction Work for 450 Wells

Saudi Aramco Plans Standalone Gas Division in Major Reorganization

Saudi Oil Lifeline Shut After Attack as Red Sea Threat Grows

Energean’s Profit Rises as Israeli Gas Operations Recover

ConocoPhillips, CNOOC Put Penglai Field off China Into Full Operation

ADNOC, SLB Roll Out AI Platform Across More Than 120 Drilling Rigs

Saipem Cuts Earnings Outlook as Middle East Costs Rise

BP Moves Indonesia CCUS Project Into Offshore Installation Phase

ABL Gets Papua New Guinea FSO Job

Unity Enters Asia-Pacific Market with Malaysia P&A Work

Current News

LNG Flows Through Hormuz Hit Seven-Month High

Inpex Buys Into Two BP-Operated Indonesian Offshore Blocks

TGS to Reprocesses Seismic Data for Petronas’ Megah Discovery

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

KKB Unit to Deliver Offshore Structures for Shell’s Malaysian Fields

Kazakhstan Resumes Action to Collect $5.2B Kashagan Field Fine

SBM Offshore Taps Chinese Contractor for FPSO Topside Modules

Arabian Drilling Inks $533M Deal for Four Jack-Up Drilling Rigs

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com