Ivar Aasen Now Operated from Land

Thursday, January 17, 2019

Aker BP on Wednesday said it has begun operating the permanently manned North Sea platform Ivar Aasen from an onshore control room in Trondheim, Norway.

The Ivar Aasen platform was constructed with two identical control rooms – one on the platform and the other in Trondheim – and the Norwegian company said the plan has always been to move the controls to land. 

The company received the green light from Norway's Petroleum Safety Authority in November and this week started using its onshore site to monitor facilities, production, equipment and follow up everything that takes place on the field. The control room also plays a role in activating work permits, and for the arrival of vessels and helicopters within the 500-meter zone, it said.

Aker BP said even with controls moved to shore the staff of about 70 people working on Ivar Aasen, 175 kilometers off Norway's west coast, will remain as before.

The company admits there is still much to be learned from this new method of managing (both for Aker BP and for the industry), but said the activity unlocks considerable potential for increased revenues because subsurface experts are closer to the control room.

Categories: Technology Europe Production Automation

Related Stories

Saipem Lands $425M Turkish Gas Contract in Sakarya Expansion

Russia Gives ExxonMobil More Time to Exit Sakhalin-1 Oil and Gas Project

India's ONGC Set to Retain 20% stake in Russia's Sakhalin-1 Project

Russia Seeks to Boost Oil Exports to China as Sanctions Tighten

Aramco Expands US Partnerships with $30B in New Deals

Sponsored: Policy, AI, and Capital Take Center Stage at ADIPEC 2025

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

How Hot Is Your Cable? Understanding Subsea Cable Thermal Performance

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

US Pressure on India Could Propel Russia's Shadow Oil Exports

Current News

Vantris Energy Lands Petronas Job on Malaysia’s Offshore Fields

Murphy Oil Appraisal Well Boosts Resource Outlook at Field off Vietnam

Viridien Kicks Off Multi-Client Reimaging Program off Malaysia

Petrovietnam Agrees First-Ever LNG Term Deal with Shell

ADNOC Takes FID on SARB Deep Gas Project Offshore Abu Dhabi

Jereh Group Delivers Oil Separation Systems for Petrobras’ FPSO Units

Offshore Rig Outlook: As 2025 Challenges Fade, Path Ahead Brightens

Offshore Energy and Boosting the Energy Efficiency of Water Processes

Low Demand, High Supply Keeps Asia LNG Spot Prices Flat

Following Big Loss in 2025, Oil Steadies

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com