SeaRose FPSO Production Remains On Hold

Laxman Pai
Monday, January 7, 2019

Oil production continues to be suspended at the SeaRose FPSO, about 350 kilometers east of St. John’s for the last 50 days. There’s no information on when production will resume.

Production was suspended and shutdown began on November 16 after two spills -  an estimated 250,000-liter spill - following a storm.

Efforts were underway to resume production after the storm when a failed flowline connector near the South White Rose Extension drill center caused oil to be spilled into the environment.

According to a notification from Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB), "shutdown maintenance activities are ongoing at the SeaRose FPSO, and production operations remain suspended."

Vessel, satellite and ROV inspections at the South White Rose Extension are continuing, it said.

"Our focus remains on reviewing Husky’s plan for plugging of the flowline and recovery of the failed flowline connector to ensure the work can be carried out in a safe and environmentally responsible manner," the board stated.

Husky has submitted a plan to deal with the separated subsea flowline and will meet with C-NLOPB staff this week to review. The plan must be approved by the C-NLOPB and partner agencies before being implemented.

The C-NLOPB continues its investigation into the mid-November incident.

Categories: Environmental Government Update Offshore Energy FPSO Production Offshore Floating Production Government Regulations Safety & Security Inspection & Repair & Maintenance

Related Stories

Oil Falls More Than 2% as US-Iran Tensions Ease

Oil Holds Steady as Markets Assess Renewed US-Iran Hostilities

Conrad Secures Drilling Rig for Mako Gas Field off Indonesia

BP Launches Gas Production at Azerbaijan’s Giant ACG Field

Petrobras Nears Deal With SBM Offshore for Two Sergipe FPSOs

Three Dead After Incident at Petronas' FSO Offshore Malaysia

Wood Secures Subsea Design Scope on QatarEnergy’s Bul Hanine Redevelopment

Lloyd’s Register Approves Wison’s Internal Turret FPSO Concept

Eni Advances Giant Indonesia Gas Discovery after ‘Exceptional’ Well Test

Pertamina Unit to Operate Indonesia’s Lavender Block under 30-Year PSC

Current News

JERA Takes Delivery of First LNG Cargo from Australia's Barossa Gas Project

Inpex’s Ichthys LNG Strike Persists as Fair Work Hearing Gets Postponed

Oil Falls More Than 2% as US-Iran Tensions Ease

TGS Books 3D Streamer Seismic Job in Africa and Middle East region

Hormuz Reopening Could Trigger OPEC’s Next Big Challenge

EnQuest to Buy Malaysia Offshore Interests in $833M Deal

Oil Holds Steady as Markets Assess Renewed US-Iran Hostilities

ADNOC Looks to Canada for Upstream and LNG Growth Through XRG

Petronas Signs 20-Year LNG Supply Deal with Japan's JERA

Oil Prices Slide as Israel-Iran Suspend Strikes

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com