China Harbour Engineering to Build Berri Field in Saudi Arabia

Shailaja A. Lakshmi
Monday, September 17, 2018

Saudi Arabian oil giant Saudi Aramco has awarded a contract to China Harbour Engineering Arabia for the construction of two  drilling islands under the company’s Berri Increment Program (BIP).

The objective of the BIP is to produce an additional 250,000 barrels per day of Arabian Light crude oil from the Berri Oil Field to reach 500,000 barrels per day to maintain Saudi Aramco’s maximum sustained capacity by early 2023.

A signing ceremony to mark the contract award was held in Dhahran. Signing on behalf of Saudi Aramco was its Vice President of Project Management, Fahad Al-Helal while China Harbour Engineering was represented by Wu Yuansheng, General Manager of China Harbour Engineering Arabia.

The Program includes the installation of a new Gas Oil Separation Plant (GOSP) in Abu Ali Island and additional gas processing facilities at the Khursaniyah Gas Plant (KGP) to process 40,000 barrels per day of hydrocarbon condensate associated with the Berri Crude Increment. Related pipelines, water injection facilities, onshore drilling sites, drilling islands and offshore facilities are also included.

Under the contract awarded to China Harbour Engineering, two (2) drilling islands shall be constructed near shore at the north and south sides of the King Fahad Industrial Port (KFIP) causeway in Jubail, to support the Berri field production capacity islands.

The two drill sites referred to as Site A and Site B will have an approximate overall area of 616,553 square meters and 263,855 square meters respectively.  

Categories: Offshore Contracts Offshore Energy

Related Stories

Tender-Assist Rigs: Southeast Asia’s Quiet Workhorses Head for Full Utilization

Aker Solutions Lands Major Role in Qatar’s Offshore Oil Field Revamp

Aramco Targets Hormuz Bypass with East-West Pipeline Expansion

Riyadh Attacks Disrupt Oil Majors' Summit Plans

Oil Industry Braces for Years of Market Disruption

Iran Set to Keep Hormuz Shut Until Seven Demands Are Met

TGS to Reprocesses Seismic Data for Petronas’ Megah Discovery

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

Oil Drops as Hormuz Reopening Prospects Ease Supply Concerns

Oil Goes Down 2% as Saudi Supply Concerns Recede

Current News

Velesto’s Jack-Up Rig Up for Drilling Job with Petronas

Tender-Assist Rigs: Southeast Asia’s Quiet Workhorses Head for Full Utilization

Aker Solutions Lands Major Role in Qatar’s Offshore Oil Field Revamp

TotalEnergies Inks 15-Year LNG Supply Deal with China's Jiangsu Guoxin

Baker Hughes Sets Up Global Network to Bolster Mature Oil and Gas Fields Production

Valaris Secures $600M in New Contracts as Backlog Rises to $4.8B

Production Restart at Australian Offshore Fields Boosts Jadestone's Oil Output

Aramco Targets Hormuz Bypass with East-West Pipeline Expansion

ADES Lands New Offshore Drilling Rig Deals in Angola and Indonesia

Shell to Exit Australia's North West Shelf Project in $1.45B Deal with XRG

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com