Aibel-Built Modules for Bacalhau FPSO Set Sail for Singapore

Wednesday, January 24, 2024

The topside modules for the giant Bacalhau floating production storage and offloading (FPSO) unit have started the journey to Singapore where they will be integrated with the hull before heading for an assignment to Equinor-operated oil project offshore Brazil.

The 22,000 tons of newly constructed modules, designed and built by Norwegian firm Aibel, have left its yard in Thailand.

The modules will be installed on board the Bacalhau FPSO in Singapore, whose hull was delivered in July 2023 from DISC shipyard in China.

Following integration, the complete vessel will be delivered by MODEC to end-client and operator Equinor.

It will be one of the world’s largest FPSOs and is to be deployed at the Bacalhau field off the coast of Brazil.

The development of the field located in the Santos Basin will cost around $8 billion.

The development includes 19 subsea wells that will be tied back to the Bacalhau FPSO, whose production capacity is 220,000 barrels of oil equivalent per day (boe/d).

Aside from Equinor, the Bacalhau project includes ExxonMobil, Petrogal Brasil S.A. and Pré-Sal Petróleo S.A. (PPSA). The first oil production is planned for 2024.

Bacalhau FPSO's Hull (Credit: Equinor)

Categories: Energy Engineering Industry News Activity FPSO South America Asia

Related Stories

TGS to Reprocesses Seismic Data for Petronas’ Megah Discovery

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

KKB Unit to Deliver Offshore Structures for Shell’s Malaysian Fields

Eni and Petronas JV Extend Drilling Backlog for Ventura Offshore’s Semi-Sub Rig

MODEC, Eld Energy Advance Fuel Cell Power for FPSOs

ABS Backs Hanwha Ocean’s Standardized FPSO Design

Technip Energies Nets Engineering Services Job for ADNOC Offshore

McDermott Gets ADNOC’s ‘Mega Contract’ to Advance Umm Shaif Field

FPSO for Azule Energy’s Angola Offshore Field Starts Taking Shape in China

Eni-Petronas JV Starts Indonesia-Bound FPSO Construction

Current News

Eni Taps Yinson Production for Major Ghana FPSO Gas Upgrade

ADNOC Signs Multi-Year LNG Supply Deal with Thailand’s Gulf Group

Iran Set to Keep Hormuz Shut Until Seven Demands Are Met

LNG Flows Through Hormuz Hit Seven-Month High

Inpex Buys Into Two BP-Operated Indonesian Offshore Blocks

TGS to Reprocesses Seismic Data for Petronas’ Megah Discovery

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

KKB Unit to Deliver Offshore Structures for Shell’s Malaysian Fields

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com