Petronas Carigali Taps Handal for Offshore Crane Work

Monday, August 29, 2022

Malaysia's Handal Energy said that its Handal Cranes subsidiary had received two letters of award from Petronas Carigali (“PCSB”).

The LOAs are in relation to the companies' master service agreement for lifting equipment operation and maintenance services. The contract will be in effect for three years. 

The contracts do not have any specified value as it is on a “call-out” basis whereby work orders will be issued at the discretion of PCSB based on the company's activities schedule and rates throughout the duration of the contracts.

Under the contracts, Handal Cranes will be responsible for various maintenance, services and supply of parts for offshore pedestal and jib cranes on Petronas' facilities; and various maintenance, services, and supply of parts for other lifting equipment.


Categories: Energy Industry News Activity Asia Cranes

Related Stories

Petronas Signs Offshore Oil Recovery Collaboration Deal

Conrad Secures Drilling Rig for Mako Gas Field off Indonesia

Velesto’s Jack-Up Rig Up for Gulf of Thailand Drilling Campaign

Kuwait Sees 70% Oil Output Recovery within Two Months of Hormuz Reopening

Ichthys LNG Strike Causes Delay to Taiwan-Bound Cargo

Azerbaijan’s Absheron Gas Project Advances with New Sales Agreement

Iran Restarts Output at Three South Pars Offshore Gas Platforms

Petrobras Nears Deal With SBM Offshore for Two Sergipe FPSOs

Indonesia Locks In LNG Supplies from Inpex' Abadi and Eni’s South Hub

Oil Prices Rise as Iran Talks Stall and Inventories Shrink

Current News

Oil Slips as Oman Reports Normal Operations at Key Oil Terminal

Petronas Signs Offshore Oil Recovery Collaboration Deal

SBM Offshore to Sell 45% Stake in Mexico-Bound FSO to NYK

Conrad Secures Drilling Rig for Mako Gas Field off Indonesia

Oman’s Block 50 Offshore Drilling Ops Face Further Delays

Aramco Picks McDermott for Energy Projects in Saudi Arabia

Velesto’s Jack-Up Rig Up for Gulf of Thailand Drilling Campaign

Kuwait Sees 70% Oil Output Recovery within Two Months of Hormuz Reopening

Capricorn Energy Grants Third Extension for Potential Takeover Offer

Ichthys LNG Strike Causes Delay to Taiwan-Bound Cargo

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com