Velesto Nets $13,4M P&A Work at Petronas' Tembungo Offshore Field

OE Staff
Friday, August 26, 2022

Malaysian oil and gas company Petronas has awarded a contract to the offshore services firm Velesto for the plugging and abandonment services at Tembungo A & B platforms offshore Sabah, Malaysia.

Velesto said Thursday that the contract had an estimated value of 60 million Malaysian ringgits (around $13,4 million).

The P&A campaign is set to last 21 months for the Tembungo-A campaign running until January 2024, with an extension option of 12 months for Tembungo-B tentatively from January 2024 until December 2024. 

Velesto will be providing integrated project management and hydraulic workover unit services for the duration of the campaign. 

The platforms are located at the Tembungo offshore oil and gas field, situated 75km from Kota Kinabalu, Sabah and 35 km northeast of Erb West field. The average water depth in the area is around 85 meters. First oil from Tembungo was produced in September 1974.


Categories: Energy Industry News Activity Asia Decommissioning Plugging and Abandonment

Related Stories

Inpex, Unions Reach Deal to End Ichthys LNG Strike

TGS Books 3D Streamer Seismic Job in Africa and Middle East region

ADNOC Looks to Canada for Upstream and LNG Growth Through XRG

Petronas Signs 20-Year LNG Supply Deal with Japan's JERA

Ichthys LNG Strike Intensifies as Union Talks with Inpex Collapse

Oil Shoots Over $4 as Israel Expands Strikes Against Iran and Lebanon

Conrad Secures Drilling Rig for Mako Gas Field off Indonesia

Velesto’s Jack-Up Rig Up for Gulf of Thailand Drilling Campaign

Ichthys LNG Strike Causes Delay to Taiwan-Bound Cargo

Indonesia Targets Higher Oil and Gas Output in 2027

Current News

Aramco Explores Asset Sales in Multi-Billion Dollar Fundraising Push

Post-War Gulf Faces Push for Alternative Export Routes

Oil Drops to 3-Month Low as US-Iran Deal Signals Supply Return

RINA Gets Safety Assessment Role on Indonesia's H2WATT Hydrogen Hub

IEA Expects Gradual Hormuz Recovery, Oversupplied Market in 2027

Inpex, Unions Reach Deal to End Ichthys LNG Strike

Gulf Marine Services Restarts Ops of Evacuated Gulf Vessels

Japan’s Shipping Industry Awaits Clarifications on Hormuz Reopening

Oil Slumps as US-Iran Reach Initial Peace Deal to Reopen Strait of Hormuz

JERA Takes Delivery of First LNG Cargo from Australia's Barossa Gas Project

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com