Ruya Project in Qatar: McDermott Wins One of Its Largest Ever Offshore FEED Deals

OEDigital
Thursday, June 2, 2022

McDermott International has won a Front-End Engineering Design (FEED) contract by the Qatari North Oil Company (NOC) for the Ruya Development, previously referred to as Al-Shaheen Phase 3-Batch 1, located offshore Qatar. 

"This award is one the largest FEED projects undertaken in McDermott's history and follows the successful completion of the pre-FEED contract," McDermott said.

"This is a strategic contract for our offshore business in Qatar and a game-changer for McDermott as it represents the largest offshore FEED we have ever received in the Middle East," said Tareq Kawash, McDermott's Senior Vice President, Offshore Middle East. "As was the case for the Pre-FEED with NOC, work will be led from our highly skilled Doha operating center and will be supported by our Chennai engineering office."

"The award strengthens our successful collaboration with NOC and demonstrates the continuity of our business relationship with them," said Neil Gunnion, McDermott Qatar Country Manager and Vice President Operations. "Utilizing our comprehensive experience and in-depth knowledge of the offshore sector in Qatar, we look forward to continuing to work closely with NOC to contribute to the development of Shaheen, which is Qatar's largest offshore oil field."

The scope of the contract comprises developing FEED studies and deliverables suitable for an engineering, procurement, construction, installation and commissioning (EPCIC) project. This includes creating technical output data (FEED data), providing EPCIC schedule and cost estimates, and developing an early work plan for the brownfield scope with necessary site surveys. The scope also ensures that new greenfield facilities design and brownfield modifications comply with applicable rules and regulations.

Categories: Middle East Engineering Industry News

Related Stories

India Resumes Iranian Oil Imports After Seven-Year Hiatus

Oil Holds Steady as Supply Risks from War Persist

Oil Rises as Widening Conflict Endangers Red Sea, Hormuz Flows

Asian Buyers Rush for Russian Oil Amid Supply Disruption

Rising Costs of War: Gulf Energy Infrastructure Stares Down $25B Repair Bill

US to Deploy Amphibious Assault Ship, Marines to Middle East

TVO Customizes Tethered BOP Technology

Iran War Exposes Risks of Fossil Fuel Dependence

Aramco Warns of Severe Oil Market Fallout from Hormuz Blockade

Governments Move to Shield Economies as Oil Jumps 25%

Current News

ABL Transports Northern Endeavour FPSO to Recycling Yard

Fire at ONGC's Offshore Platform Injures 10, Operations Normalized

CPC Oil Exports via Black Sea Stable After Attack Reports

Russia’s Yamal LNG Resumes Shipments to China After Months-Long Gap

Energy Crisis from War on Iran Deeper Than Widely Assumed

Oil Shoots Over $110 as Trump's Iran Deadline Looms

IEA: Current Oil And Gas Crisis Exceeds Past Shocks Combined

Oman’s Block 50 Offshore Drilling Ops Pushed to May

India Resumes Iranian Oil Imports After Seven-Year Hiatus

Oil Holds Steady as Supply Risks from War Persist

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com