Carnarvon Spuds Buffalo-10 Well

Friday, December 31, 2021

Carnarvon Energy announced drilling has commenced at the Buffalo-10 well in the Timor Sea as the Australian oil and gas company aims to confirm sufficient hydrocarbons to support an economic development at the shut in Buffalo field north of Australia.

The company said on Friday that the Valaris JU-107 jack-up rig has drilled the top hole section down to around 120 meters following a slight delay caused by a tropical weather system. The current operation involves the installation and cementing of the conductor.

Once the surface casing has been cemented in place, the rig will drill 17 ½” hole to a planned section depth of approximately 800 meters measured depth (MD), followed by setting the 13 ⅜” casing. Following this, the well is planned to drill the 12 ¼” hole section to approximately 2,800 meters MD before setting the 9 ⅝” casing.

No hydrocarbons are anticipated to be intersected in these drilling sections, Carnarvon said.

The Buffalo oil field resides in 30 meters of water with a reservoir depth between 3,200 and 3,300 meters below the seabed. The previous field proved the existence of a very high deliverability reservoir containing high quality light oil that Carnarvon expects would sell at a premium to Brent in today’s market.

The Buffalo-10 well will penetrate the existing oil column (because the field was still producing when it was shut-in in 2004) to assess the extent of the revised mapped attic oil column as illustrated in the schematic diagram below:

(Image: Carnarvon Energy)Carnarvon’s mid case recoverable volume estimate is 31 million barrels (gross, 2C contingent resource). With the minimum economic field size estimated to be significantly lower than the mid case estimate, there is a strong likelihood the Buffalo-10 well will confirm an economic project. Accordingly, Carnarvon’s drilling plans provide for the Buffalo-10 well to be retained as the first production well in the redevelopment program.

Carnarvon said it is working with project partner Advance Energy on plans to compress the timeline to first production once the Buffalo-10 well confirms a commercial oil resource. These plans include engaging with local industry for the supply and installation of suitable equipment to produce the oil.

Categories: Drilling Activity Oil Australia/NZ

Related Stories

Beam’s AI-Driven AUV to Hit Offshore Wind Market in 2025

TotalEnergies Inks 15-Year LNG Supply Deal with China’s Sinopec

Shelf Drilling Secures $200M Contract Extensions with Chevron for Thailand Ops

East Timor Eyes Chinese Partners for Stalled Greater Sunrise Gas Development

Eni Strengthens LNG Ties with Japan

Nong Yao C Development Bolsters Valeura’s Production Rates Off Thailand

First Oil Starts Flowing at CNOOC’s South China Sea Field

Santos Pens Mid-Term LNG Supply Deal

Equinor Picks SHI as Preferred Supplier for Korean 750 MW Floating Wind Project

Shelf Drilling Sells Baltic Jack-Up Rig

Current News

Velesto Completes Removal of Wrecked Naga 7 Jack-Up Rig Off Malaysia

BP Greenlights $7B CCUS Scheme Tied to Indonesia LNG Facility

Sapura Scoops Petrobras Contract for Pan-Malaysia Offshore Services

Velesto’s Drilling Rigs Up for Automatization Overhaul Under New Tech Alliance

US Firm Finds Chinese Partner to Deliver Mobile Offshore Drilling Units

TotalEnergies and Oil India to Jointly Tackle Methane Emissions Issues

Keppel Reclaiming Control of 13 Rigs to Cash In on Offshore Drilling Market's Growth

Global Offshore Wind Stumbles to the End of '24

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Malaysia's FPSO Firm Bumi Armada Eyes Merger with MISC’s Offshore Unit

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com