CNOOC's Luda 6-2 Offshore Oil Field Starts Production

Monday, August 23, 2021

China's state-run offshore oil and gas explorer and producer CNOOC said Monday it had started production from its Luda 6-2 oil field ahead of schedule.
Luda 6-2 oilfield is located in Liaodong Bay of Bohai Sea, with an average water depth of about 30 meters. 

"In addition to fully utilizing the existing processing facilities of Suizhong 36-1 oilfield, the project has built a new central platform," CNOOC said.

 A total of 38 development wells are planned, including 29 production wells, 8 water injection wells and 1 development and appraisal well. 

The project is expected to reach its peak production of approximately 10,000 barrels of crude oil per day in 2022.

Categories: Production Asia

Related Stories

Pakistan’s OGDC to Start Production at ADNOC’s Offshore Block by 2027

INEOS Wraps Up Acquisition of CNOOC’s US Oil and Gas Assets

‘Ultra-Mega’ Offshore Deal for L&T at QatarEnergy LNG’s North Field Gas Scheme

All Gas from Conrad’s Mako Field to be Sold to Indonesia’s PLN

Valeura Wraps Up Infill Drilling Campaign in Gulf of Thailand

Six New Gas Wells in Line for BP’s Shah Deniz Field in Caspian Sea

ONGC and BP Sign Deal to Boost Production at India's Largest Offshore Oil Field

Kazakhstan Looks to Improve Oil Production Agreements Terms

Abu Dhabi's NMDC Group Gets $1.1B Subsea Gas Pipeline Job in Taiwan

ADES’ Fourth Suspended Jack-Up Rig Gets Work Offshore Thailand

Current News

Indonesia's Medco Starts Production at Natuna Sea Fields

Indonesia Grants Approval to Kuwaiti Firm for Anambas Block in Natuna Sea

ADNOC’s XRG Partners Up with Petronas for Offshore Gas Block in Caspian Sea

Valeura Energy Greenlights Wassana Oil Field Redevelopment off Thailand

Scarborough FPU's Topsides and Hull Come Together in Major Engineering Feat (Video)

Shell-Reliance-ONGC JV Complete India’s First Offshore Decom Project

The Future of Long-Idle Drillships: Cold-Stacked or Dead-Stacked?

TMC Books Compressors Orders for FPSO and LNG Vessels

MODEC, Sumitomo Partner Up for Delivery of Gato do Mato FPSO

Chuditch Gas Field Up for Summer Drilling Ops as Sunda Reshapes Ownership Structure

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com