McDermott's CB&I Nets Another Philippines LNG Terminal Deal

Wednesday, August 18, 2021

McDermott's CB&I Storage Solutions business has been awarded a contract by Atlantic Gulf and Pacific Company of Manila, Inc. (AG&P) to build a second LNG storage tank and double-wall LNG bullet for AG&P's Philippines LNG import and regasification terminal called Philippines LNG (PLNG) in Batangas Bay, Philippines.

CB&I Storage Solutions was awarded the first LNG storage tank by AG&P earlier this year.

The additional scope includes a 1,200 cubic-meter shop-fabricated double-wall LNG bullet and a second 60,000 cubic-meter full containment steel LNG tank along with geotechnical investigation, soil improvement, foundation and topside platform structure, pre-commissioning, purging, and commissioning activities.

Mechanical completion is slated for the first quarter of 2022 for the LNG bullet and the second quarter of 2024 for the second tank with purging and commissioning activities to follow. McDermott did not share the financial details of the award.

Categories: Ports LNG Terminals

Related Stories

Yinson Production, “K” LINE Target Europe's CCS with FSIU and LCO2 Solutions

French Oil Major Acquires Interests in Multiple Blocks in Southeast Asia

Fugro Expands Geotechnical Testing Capabilities in Indonesia

UK Firm Secures Exploration Extension for Two Blocks off Vietnam

ABL Lands Work on BP’s Indonesian Gas and CCUS Project

CNOOC Starts Production at Offshore Field in South China Sea

CDWE Wraps Up Pin Pile Installation Job for Taiwanese Offshore Wind Farm

TPAO, SOCAR and BP to Ink Caspian Sea Oil and Gas Production Deal

OMV Exits Ghasha Gas Project off UAE with Lukoil Stake Sale

Scarborough FPU's Topsides and Hull Come Together in Major Engineering Feat (Video)

Current News

Petronas Expands Suriname Portfolio with Deepwater Block Acquisition

Japanese Oil and Gas Firm Enters Two Blocks off Malaysia

Yinson Production, “K” LINE Target Europe's CCS with FSIU and LCO2 Solutions

Woodside Agrees Long-Term LNG Supply with Petronas Unit

MODEC and Terra Drone Renew FPSO Drone Inspection Partnership

Yinson Production Closes $1B Investment to Drive Further Growth

Petronas-Eni Upstream Joint Venture to Take Up to Two Years to Set Up

Wood JV Gets EPC Job for Shell off Brunei

Chuditch Gas Field Drilling Ops Get Delayed to Next Year

French Oil Major Acquires Interests in Multiple Blocks in Southeast Asia

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com