Sakhalin Energy: Maintenance Continues at LNG Train 2

Alexander Marrow and Jessica Jaganathan
Wednesday, August 18, 2021

Russian liquefied natural gas producer (LNG) Sakhalin Energy said on Wednesday post-shutdown commissioning was continuing at the second LNG train at its Prigorodnoye production complex.

Comprehensive maintenance work, which began on July 9, had been initially due to last around 37 days, meaning the stoppages had been expected to finish by around this week. Sakhalin Energy said the first LNG train had restarted and the Amur River LNG carrier had departed with a first LNG cargo.

It was not immediately clear when the second LNG train would be back online fully, but two Singapore-based traders said that up to five LNG cargoes had been delayed from the plant.

The 11.49 million tonnes per annum (mtpa) Sakhalin-2 LNG project comprises two LNG production trains and supplies the super-chilled fuel mainly to Japan, South Korea, and China.

Sakhalin Energy said the maintenance took place at several assets, including the Lunskoye-A offshore gas production platform, the onshore processing facility, and the Prigorodnoye production complex.

The company added that it decided to complete some of the maintenance work which had originally been planned for autumn and winter of this year and for next year and hence, would skip a major maintenance next year.

Going forward, each train would be shut down once every two years, the company said. 

(Reporting by Alexander Marrow in Moscow and Jessica Jaganathan in Singapore; Editing by Jacqueline Wong)

Categories: Offshore LNG Production Asia

Related Stories

TGS Gets Exclusive Rights for Seismic Survey Offshore Brunei

Oman Opens Alternative Hormuz Lanes as Shipping Recovery Continues

ASCO Sets Up Shop in Qatar to Drive Middle East Expansion

Oil Slumps as US-Iran Reach Initial Peace Deal to Reopen Strait of Hormuz

ADNOC Looks to Canada for Upstream and LNG Growth Through XRG

Petronas Signs 20-Year LNG Supply Deal with Japan's JERA

Kuwait Sees 70% Oil Output Recovery within Two Months of Hormuz Reopening

Ichthys LNG Strike Causes Delay to Taiwan-Bound Cargo

Petronas Signs 20-year Charter Deal with MISC for Five LNG Carrier Newbuilds

Iraq, Pakistan Secure Oil Shipments via Hormuz with Iran Agreements

Current News

Gastech 2026 to convene global energy leaders in Bangkok as Asia accelerates demand, LNG investment and system transformation

TotalEnergies Sells Malaysia Offshore Gas Field Stake to Inpex

MODEC Advances Construction of Brazil-Bound Gato do Mato FPSO

Oil Hits Four-Month Low After US-Iran Doha Talks

SLB to Support Kuwait Oil's AI and Digital Tech Initiative

Sunda Reviews Timor-Leste Appraisal Plans as New Zealand Deal Advances

TGS Gets Exclusive Rights for Seismic Survey Offshore Brunei

Petronas Unit Probes Cause of Fire at Offshore Platform in Malaysia

SBM Offshore, SWS Sign Deal for Seventh FPSO Hull

Hormuz Reopening Risks Turning Oil Shortage Into Glut

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com