Sakhalin Energy: Maintenance Continues at LNG Train 2

Alexander Marrow and Jessica Jaganathan
Wednesday, August 18, 2021

Russian liquefied natural gas producer (LNG) Sakhalin Energy said on Wednesday post-shutdown commissioning was continuing at the second LNG train at its Prigorodnoye production complex.

Comprehensive maintenance work, which began on July 9, had been initially due to last around 37 days, meaning the stoppages had been expected to finish by around this week. Sakhalin Energy said the first LNG train had restarted and the Amur River LNG carrier had departed with a first LNG cargo.

It was not immediately clear when the second LNG train would be back online fully, but two Singapore-based traders said that up to five LNG cargoes had been delayed from the plant.

The 11.49 million tonnes per annum (mtpa) Sakhalin-2 LNG project comprises two LNG production trains and supplies the super-chilled fuel mainly to Japan, South Korea, and China.

Sakhalin Energy said the maintenance took place at several assets, including the Lunskoye-A offshore gas production platform, the onshore processing facility, and the Prigorodnoye production complex.

The company added that it decided to complete some of the maintenance work which had originally been planned for autumn and winter of this year and for next year and hence, would skip a major maintenance next year.

Going forward, each train would be shut down once every two years, the company said. 

(Reporting by Alexander Marrow in Moscow and Jessica Jaganathan in Singapore; Editing by Jacqueline Wong)

Categories: Offshore LNG Production Asia

Related Stories

Vietsovpetro Brings BK-24 Oil Platform Online Two Months Early

Seatrium Secures ABS Backing for Deepwater FPSO Design

MDL Secures Cable Laying Job in Asia Pacific

Synergy Marine Group Completes Conversion of LNG Vessel to FSRU

CNOOC Brings Online Another Oil and Gas Project in South China Sea

Technip Energies Gets FEED Job for Inpex’ Abadi LNG Project in Indonesia

Seatrium Signs FLNG Vessel Upgrade Deal for Golar LNG

ADNOC Signs Long-Term LNG Deal with Hindustan Petroleum Corporation

Yinson, PTSC Get $600M Contract for Vietnam-Bound FSO

Thailand's PTT to Buy LNG from Glenfarne's Alaska LNG Project

Current News

Malaysia’s Petronas and Oman’s OQEP Strengthen Oil and Gas Ties

Southeast Asia’s 2GW Cross-Border Offshore Wind Scheme Targets 2034 Buildout

Pharos Energy Kicks Off Drilling Campaign Offshore Vietnam

Viridien to Shed More Light on Malaysia’s Offshore Oil and Gas Potential

US Pressure on India Could Propel Russia's Shadow Oil Exports

Energy Drilling’s EDrill-2 Rig Starts Ops for PTTEP in Gulf of Thailand

RINA Wins FEED Contract for Petronas’ Flagship CCS Project in Malaysia

ABL Secures Rig Moving Assignment with India's ONGC

Pakistan, Türkiye Deepen Oil and Gas Ties with Offshore Indus-C Block Deal

Eni-Petronas Gas Joint Venture Up for Launch in 2026

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com