Santos' New Well at Van Gogh Offshore Oil Field Hits Output Record

Monday, July 26, 2021

Australian oil and gas company Santos has started oil production from the Van Gogh Phase 2 Infill Development, offshore W. Australia, hitting a production record.

Santos had announced a Final Investment Decision (FID) on the Van Gogh Infill Development Phase 2 Project in March 2020, with the project involving the drilling and completing of three new horizontal, dual-lateral production wells and subsea tieback into existing infrastructure.

Announcing the first oil on Monday, Santos said that the first of three new production wells was producing at the highest initial rate from an individual well in field history. Production from Van Gogh began in 2010, with the nearby Coniston and Novara fields tied back to the FPSO in 2015 and 2016, respectively.

"Following completion and tie-in, the first well has produced at a peak rate of 23,200 barrels per day (bbl/d), well ahead of expectations for a single well," Santos said.

The drilling of the second horizontal, dual-lateral production well now underway. 

The Van Gogh field (WA-35-L) is one of three subsea oil field developments located in the Exmouth Basin which tie into the Ningaloo Vision FPSO. 

Santos Managing Director and Chief Executive Officer Kevin Gallagher said:"The team has done a great job delivering first oil so quickly, accessing additional reserves and lowering unit production costs.

"We have seen an excellent reservoir outcome from this first well with a larger oil column than expected and a total horizontal section of 5,430 metres, which is 490 meters more than originally planned.

 “I am particularly pleased that this is a great example of Santos creating value from assets we acquired, through an opportunity that was not valued at the time of the acquisition. 

“This is also the highest peak production seen from a single well in the Van Gogh field and exceeded our pre-drill expectations. “The Van Gogh crude oil is also a highly sought-after product, and the premium to Brent that we get allows further value to be realized beyond the current oil price.” 

The Valaris MS1 offshore drilling rig will complete the remaining two wells over the next few months, with start-up expected before the end of the year. 

Santos has a 52.5% interest in the Van Gogh-Coniston-Novara project, which it operates. The remaining interest is owned by INPEX.

Categories: Energy Activity FPSO Production Floating Production

Related Stories

BP Suspends Production at Azerbaijani Platform for Maintenance Works

Seatrium Scoops $259M Worth of Repairs and Upgrades Work

Dyna-Mac Secures $664M Backlog with New Contracts

First Production Starts at ADNOC’s Belbazem Offshore Block

Exxon Mobil Continues to Ramp Up LNG Portfolio

MoU Signed for Offshore Wind Solutions in Taiwan

BP's Carbon Emissions Rise for the First Time Since 2019

Petronas Signs Gas PSCs for BIGST and Tembakau Clusters Offshore Malaysia

Three Questions: Matt Tremblay, VP, Global Offshore Markets, ABS

QatarEnergy and Petronet Sign 20-Year LNG Supply Deal for India

Current News

Unique Group Acquires Subsea Innovation

ConocoPhillips Misses Quarterly Profit Estimates

Taliban Plan Regional Energy Trade Hub with Russian Oil in Mind

Russia Shipping Oil to North Korea Above UN Mandated Levels

Yinson Completes $1.3B Financing for Agogo FPSO

Sapura Energy Hooks Subsea Services Contract from Thai Oil Major Off Malaysia

Philippines' PXP Energy Eyes Petroleum Blocks in Non-Disputed Areas

BP Suspends Production at Azerbaijani Platform for Maintenance Works

SOVs – Analyzing Current, Future Demand Drivers

Decarbonization Offshore O&G: Navigating the Path Forward

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com