Eni Hires PV Drilling VI Jack-Up for Drilling Offshore Vietnam

Bartolomej Tomic
Tuesday, January 5, 2021

Vietnamese offshore drilling company PV Drilling has recently signed a contract with Italian oil giant Eni for the supply of its PV Drilling VI jack-up rig.

The contract, with Eni Vietnam, is for the oil company's 2021 drilling campaign, scheduled to start in early January off the coast of Vietnam.

While PV Drilling did not share the agreed rig day rate, Bassoe Analytics estimates the day rate to be around $65,000 with the contract expected to last until April.

The PV Drilling VI jack-up rig was delivered in 2015 by Singapore's Keppel, and it was the 100th jackup rig Keppel FELS had built since 1970.

The jack-up rig is a KFELS B Class rig,  able to operate in water depths of up to 400 ft with a drilling depth of 30,000 ft.  

Categories: Drilling Industry News Activity Asia Rigs

Related Stories

Ventura Offshore’s Semi-Sub Rig to Keep Drilling for Eni in Asia

Seatrium Secures ABS Backing for Deepwater FPSO Design

Yinson Production Nets DNV Approval for New FPSO Hull Design

Brownfield Output Decline Accelerates, says IEA

Hanwha Ocean Enlists ABB for Singapore’s First Floating LNG Terminal

Chinese Contractor Secures Offshore Oil and Gas ‘Mega Deal’ from QatarEnergy

Valeura Makes Progress with Multi-Well Drilling Campaign in Gulf of Thailand

Four Jack-Up Drilling Rig Deals Set to Bring In $129M for Borr Drilling

Fugro Expands Geotechnical Testing Capabilities in Indonesia

BP Expands Oil and Gas Scope in Azerbaijan with New Projects and Exploration Rights

Current News

Propane’s Economic Edge for Ports During Trade Uncertainty

Shell’s Brazil-Bound FPSO Starts Taking Shape

Ventura Offshore’s Semi-Sub Rig to Keep Drilling for Eni in Asia

SBM Offshore, SLB to Optimize FPSO Performance Using AI

MODEC Ramps Up Hammerhead FPSO Work After ExxonMobil's Go-Ahead

Aesen, DOC JV Targets Subsea Cable Logistics

Timor Gap Boosts Stake in Finder Energy’s Timor-Leste Oil Fields

SBM Offshore Starts Construction of FSO for Trion Oil Field off Mexico

Russia Targets 2028 for Sakhalin-3 Gas Project Start Up

Seatrium Secures ABS Backing for Deepwater FPSO Design

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com