Triangle Energy Starts Work to Bring Two Offshore Wells Back Online

Bartolomej Tomic
Tuesday, October 27, 2020

Australian oil and gas company Triangle Energy has started works to bring back online two wells at the Cliff head offshore field in the Perth Basin, Australia.

The two wells, CH-6 and CH-7, were shut in June. CH-6 was shut due to a pump failure, while the CH-7 was shut as a precautionary measure.

Triangle Energy said Monday that the Hydraulic Workover Unit (HWU) had arrived at the Cliff Head Alpha Platform (CHA) from Fremantle marking the start of the CH-6 and CH-7 workover campaign.

"Over the coming month the Electric Submersible Pump (ESP) system on both wells will be replaced, enabling the production from these wells to be restarted by year-end 2020," Triangle Energy said.

Triangle Energy expects the workovers will return approximately 400 barrels of oil per day to Cliff Head’s production, taking total production to approximately 1000 barrels of oil per day. 

Triangle Managing Director, Rob Towner said: "Executing both workovers side by side is a significant opportunity for the Company. Not only will we maximize operational efficiency through a streamlined work program, we will bring forward production from both wells sooner than would have been the case if we'd executed both workovers separately.”

The Cliff Head field is located in the Perth Basin approximately 270 kilometers north of Perth and 12 kilometers off the coast of Dongara in Western Australia. The offshore field lies at a water depth of 15-20 meters.

Oil from the Cliff Head field is produced via electrical submersible pump production wells, with produced water reinjected into three injection wells at the offshore platform. The offshore platform is connected to the onshore Arrowsmith Stabilisation Plant by twin 14km production and injection pipelines.

The crude oil is then trucked to BP at its Kwinana refinery south of Perth.  

Categories: Energy Activity Production Australia/NZ Shallow Water

Related Stories

Vantris Energy Lands Petronas Job on Malaysia’s Offshore Fields

Petrovietnam Agrees First-Ever LNG Term Deal with Shell

India Seeks $30B from Reliance, BP Over Gas Shortfall at Offshore Fields

CNOOC Launches New Offshore Oil Development in Southern China

EnQuest Set to Top 2025 Production Forecast on Southeast Asia Gains

Petronas Enlists MISC for FPU Job at Gas Field Offshore Brunei

Finder Energy Buys Petrojarl I FPSO for Timor-Leste Oil and Gas Projects

Blackford Dolphin Semi-Sub to Keep Drilling Offshore India

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

Vietsovpetro Brings BK-24 Oil Platform Online Two Months Early

Current News

Vantris Energy Lands Petronas Job on Malaysia’s Offshore Fields

Murphy Oil Appraisal Well Boosts Resource Outlook at Field off Vietnam

Viridien Kicks Off Multi-Client Reimaging Program off Malaysia

Petrovietnam Agrees First-Ever LNG Term Deal with Shell

ADNOC Takes FID on SARB Deep Gas Project Offshore Abu Dhabi

Jereh Group Delivers Oil Separation Systems for Petrobras’ FPSO Units

Offshore Rig Outlook: As 2025 Challenges Fade, Path Ahead Brightens

Offshore Energy and Boosting the Energy Efficiency of Water Processes

Low Demand, High Supply Keeps Asia LNG Spot Prices Flat

Following Big Loss in 2025, Oil Steadies

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com