Triangle Energy Starts Work to Bring Two Offshore Wells Back Online

Bartolomej Tomic
Tuesday, October 27, 2020

Australian oil and gas company Triangle Energy has started works to bring back online two wells at the Cliff head offshore field in the Perth Basin, Australia.

The two wells, CH-6 and CH-7, were shut in June. CH-6 was shut due to a pump failure, while the CH-7 was shut as a precautionary measure.

Triangle Energy said Monday that the Hydraulic Workover Unit (HWU) had arrived at the Cliff Head Alpha Platform (CHA) from Fremantle marking the start of the CH-6 and CH-7 workover campaign.

"Over the coming month the Electric Submersible Pump (ESP) system on both wells will be replaced, enabling the production from these wells to be restarted by year-end 2020," Triangle Energy said.

Triangle Energy expects the workovers will return approximately 400 barrels of oil per day to Cliff Head’s production, taking total production to approximately 1000 barrels of oil per day. 

Triangle Managing Director, Rob Towner said: "Executing both workovers side by side is a significant opportunity for the Company. Not only will we maximize operational efficiency through a streamlined work program, we will bring forward production from both wells sooner than would have been the case if we'd executed both workovers separately.”

The Cliff Head field is located in the Perth Basin approximately 270 kilometers north of Perth and 12 kilometers off the coast of Dongara in Western Australia. The offshore field lies at a water depth of 15-20 meters.

Oil from the Cliff Head field is produced via electrical submersible pump production wells, with produced water reinjected into three injection wells at the offshore platform. The offshore platform is connected to the onshore Arrowsmith Stabilisation Plant by twin 14km production and injection pipelines.

The crude oil is then trucked to BP at its Kwinana refinery south of Perth.  

Categories: Energy Activity Production Australia/NZ Shallow Water

Related Stories

UAE Speeds Up Pipeline Project to Help Bypass Hormuz

Petronas Signs 20-year Charter Deal with MISC for Five LNG Carrier Newbuilds

ADNOC Drilling Posts Record First-Quarter Results with 5% Revenue Rise

Eni Advances Giant Indonesia Gas Discovery after ‘Exceptional’ Well Test

ADNOC Drilling Finalizes MB Petroleum JV, Expands Regional Fleet

Vessel Sector Deep Dive: WTIVs

Pertamina Unit to Operate Indonesia’s Lavender Block under 30-Year PSC

ABL Transports Northern Endeavour FPSO to Recycling Yard

Fire at ONGC's Offshore Platform Injures 10, Operations Normalized

Rising Costs of War: Gulf Energy Infrastructure Stares Down $25B Repair Bill

Current News

ScioSense Launches UFC23 Ultrasonic Flow Converter for High-Precision, Ultra-Low-Power Smart Metering

Inpex Expands Australia Gas Portfolio with Browse Minority Stake Deal

UAE Speeds Up Pipeline Project to Help Bypass Hormuz

PV Drilling Secures Jack-Up Rig Deal from Zarubezhneft off Vietnam

Longitude to Integrate SynergenOG Following ABL Group Acquisition

Petronas Signs 20-year Charter Deal with MISC for Five LNG Carrier Newbuilds

Global Oil Supply to Fall Short of Demand as Iran War Goes On, IEA Says

Iraq, Pakistan Secure Oil Shipments via Hormuz with Iran Agreements

Norway O&G Revenue Forecast Jumps 30% for '26

QatarEnergy, TotalEnergies and ConocoPhillips Team Up on Syria Offshore Block

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com