Triangle Energy Starts Work to Bring Two Offshore Wells Back Online

Bartolomej Tomic
Tuesday, October 27, 2020

Australian oil and gas company Triangle Energy has started works to bring back online two wells at the Cliff head offshore field in the Perth Basin, Australia.

The two wells, CH-6 and CH-7, were shut in June. CH-6 was shut due to a pump failure, while the CH-7 was shut as a precautionary measure.

Triangle Energy said Monday that the Hydraulic Workover Unit (HWU) had arrived at the Cliff Head Alpha Platform (CHA) from Fremantle marking the start of the CH-6 and CH-7 workover campaign.

"Over the coming month the Electric Submersible Pump (ESP) system on both wells will be replaced, enabling the production from these wells to be restarted by year-end 2020," Triangle Energy said.

Triangle Energy expects the workovers will return approximately 400 barrels of oil per day to Cliff Head’s production, taking total production to approximately 1000 barrels of oil per day. 

Triangle Managing Director, Rob Towner said: "Executing both workovers side by side is a significant opportunity for the Company. Not only will we maximize operational efficiency through a streamlined work program, we will bring forward production from both wells sooner than would have been the case if we'd executed both workovers separately.”

The Cliff Head field is located in the Perth Basin approximately 270 kilometers north of Perth and 12 kilometers off the coast of Dongara in Western Australia. The offshore field lies at a water depth of 15-20 meters.

Oil from the Cliff Head field is produced via electrical submersible pump production wells, with produced water reinjected into three injection wells at the offshore platform. The offshore platform is connected to the onshore Arrowsmith Stabilisation Plant by twin 14km production and injection pipelines.

The crude oil is then trucked to BP at its Kwinana refinery south of Perth.  

Categories: Energy Activity Production Australia/NZ Shallow Water

Related Stories

Energean Warns Prolonged Conflict May Delay $1B Gas Project

Chiyoda, NYK, KNCC Target Global CCS Value Chain Development

Oil Rises as Widening Conflict Endangers Red Sea, Hormuz Flows

Rising Costs of War: Gulf Energy Infrastructure Stares Down $25B Repair Bill

Eni Advances Major Deep Water Gas Hubs with Dual FIDs

Eni Advances Angola Gas Project, Secures $9B Credit Facility

Valeura Lifts Output with Three Producing Wells at Thailand’s Manora Field

Oil Up 8% as Middle Eastern War Rages

Seatrium Targets $40M Cost Savings in Continued Divestment Drive

MODEC, Eld Energy Partnership Targets Low-Carbon FPSO Power

Current News

OceanAlpha Shares USV Offerings at Oi26

Oil Hikes 7% after Trump Says US-Israel will Keep Striking Iran

Iran Assures Safe Hormuz Transit for Philippine Vessels

EnQuest Enters Malaysia with Cendramas Production Sharing Deal

Bahrain Push for Hormuz Shipping Resolution Hits Hurdles at UN

Energean Warns Prolonged Conflict May Delay $1B Gas Project

Iran War Reshapes Global LNG Trade

Drone Strike on Kuwaiti Oil Tanker off Dubai Signals Further Escalation in Gulf

INPEX Extends Pertamina LNG Pact, Signs Upstream MoU in Southeast Asia

Chiyoda, NYK, KNCC Target Global CCS Value Chain Development

Magazine

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com