VIDEO: BW LNG Takes Delivery of BW Pavilion Aranthera LNG Carrier

Monday, July 6, 2020

South Korea's Daewoo Shipbuilding Marine & Engineering (DSME) has delivered a new LNG Carrier - the BW Pavilion Aranthera - to its owners BW LNG. The delivery took place on Friday, July 3, 2020.

The BW Pavilion Aranthera is a 173,400 cubic meters carrier with the ME-GI dual-fuel two-stroke engine and full reliquefaction capabilities.

The vessel is BW’s fifth newbuilding with ME-GI propulsion and re-liquefaction system, in a series of nine new builds on order from DSME yard. The remaining four will be delivered by 2022, increasing the company's LNG carrier fleet size to 28 units.

According to BW LNG, the BW ME-GI vessels have a fuel consumption saving potential compared to previous generations of TFDE and Steam-vessels of 35% and 50% respectively. 

"This coupled with the low methane slippage from the ME-GI engine makes hull 2491 among the best in class in terms of CO2e emissions," BW has said.

Categories: Shipbuilding LNG Hybrid Drives Asia Shipbulding

Related Stories

Sunda Energy Secures Environmental License for Drilling Ops off Timor-Leste

Qatar LNG Halt Forces Asia to Seek Alternative Supplies

Inpex Secures Environmental Approval for Indonesia’s Abadi LNG Project

MISC Secures Long-Term Charter for Papua New Guinea's First FSO

QatarEnergy, Petronas Ink 20-Year LNG Supply Agreement

Australia and Timor-Leste Push to Advance Greater Sunrise Gas Field

Woodside to Supply LNG to JERA During Japan's Winter Peak

CNOOC Makes Major Oil Discovery in Bohai Sea

CNOOC Launches New Offshore Oil Development in Southern China

Fugro Nets Mubadala Energy’s Deepwater Gas Job in Asia

Current News

Sunda Energy Secures Environmental License for Drilling Ops off Timor-Leste

Oil Drops 7% After Trump Predicts War Could End Soon

Aramco Warns of Severe Oil Market Fallout from Hormuz Blockade

Offshore Tech: Seadrill Adopts igus’ Modular Energy Chains

OSV Market: Asia Pacific Downshifts for the Long Haul

Valeura Lifts Output with Three Producing Wells at Thailand’s Manora Field

Governments Move to Shield Economies as Oil Jumps 25%

Remazel Expands Offshore Services Footprint in Brazil with H Tech Acquisition

Lamprell Secures ONGC Deal for Subsea Pipeline Replacement Project

China’s Five-Year Plan Focuses on Oil Stability, Gas and Reserves Growth

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com