Australia: Triangle Energy Shuts Two Cliff Head Wells

Friday, June 19, 2020

Australian oil and gas firm Triangle Energy has shut production from two wells ell at the Cliff Head offshore field, one due to a pump failure, the other as a precautionary measure.

"Production from CH6 [well] was shut-in on the afternoon of 17 June 2020 due to an Electrical Submersible Pump (ESP) failure, the cause of which the company is currently investigating. 

The company said Thursday it had also shut the output from the CH7 well on June 17, as a precautionary measure during routine operational maintenance to enable the testing of the integrity of the lower completion part of the well and allow a forward remediation plan to be approved and implemented in the immediate future. 

"The Company is evaluating the options to return CH7 to production at the earliest opportunity, including near term return to production and/or a workover pre-scheduled for October 2020," Triangle said Thursday.

"The company anticipates production to stabilize at approximately 590 bopd from the other primary producing wells while these maintenance issues are resolved," Triangle Energy said.

To remind, Triangle Energy had in February shut production from its shallow-water Cliff Head Alpha oil platform citing an electrical fault. Production resumed in March.

Production from the Cliff Head field was more than 1000 barrels of oil per day on December 20, 2019. The field is located in the Perth Basin approximately 270 kilometers north of Perth and 12 kilometers off the coast of Dongara in Western Australia. The offshore field sits at a water depth of 15-20 meters.

Oil from the field is produced via electrical submersible pump production wells, with produced water reinjected into three injection wells at the offshore platform. The platform is connected to the onshore Arrowsmith Stabilisation Plant by twin 14km production and injection pipelines.

The crude oil is then trucked to BP at its Kwinana refinery south of Perth.  

Categories: Energy Subsea Industry News Activity Production Australia/NZ Shallow Water

Related Stories

Finder Energy Buys Petrojarl I FPSO for Timor-Leste Oil and Gas Projects

Pakistan Greenlights TPOC-Led Offshore Exploration in Block-C

TechnipFMC to Supply Subsea Systems for Eni’s Maha Deepwater Project

Seatrium Maintains $12.8B Order Book on Renewables and FPSO Progress

PTTEP Orders OneSubsea Systems for Two Deepwater Projects off Malaysia

US Pressure on India Could Propel Russia's Shadow Oil Exports

Vietsovpetro Brings BK-24 Oil Platform Online Two Months Early

Brownfield Output Decline Accelerates, says IEA

Saipem Bags $1.5B Contract for Türkiye Largest Offshore Gas Field

PTTEP Hires McDermott for Deepwater Subsea Job off Malaysia

Current News

Technip Energies Gets On Board Thailand’s First CCS Project

Eni Makes Significant Gas Discovery Offshore Indonesia

Petronas Enlists MISC for FPU Job at Gas Field Offshore Brunei

Japan’s JERA Signs First Long-Term LNG Deal with India’s Torrent Power

India's ONGC Set to Retain 20% stake in Russia's Sakhalin-1 Project

Harbour Energy to Sell Stakes in Indonesian Assets to Prime Group for $215M

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Finder Energy Buys Petrojarl I FPSO for Timor-Leste Oil and Gas Projects

CNOOC Puts New South China Sea Development Into Production Mode

ADES Nets $63M Contract for Compact Driller Jack-Up off Brunei

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com