KrisEnergy Suspends Wassana Oil Field Production 'Until Further Notice'

OE Staff
Wednesday, June 3, 2020

Singapore-based oil and gas company KrisEnergy has suspended production from its Wassana oil field in the Gulf of Thailand citing Covid-19 pandemic and low oil prices. It will cut its Thailand workforce by 25 percent, too.

"In view of the many uncertainties ahead – the duration of the COVID-19 pandemic, speed of global economic regeneration and recovery in petroleum demand, and the magnitude and sustainability of any upturn in oil prices – production at the KrisEnergy-operated Wassana oil field has been suspended until further notice," KrisEnergy said Wednesday.

Gross production at Wassana oil field averaged 3,605 barrels of oil per day (“bopd”) in the first quarter of 2020 and the Company’s working interest production was 3,208 bopd. KrisEnergy holds an effective 89.0% working interest in the G10/48 concession and Palang Sophon Offshore holds an
effective 11% working interest. 

The Wassana field in the G10/48 concession in the Gulf of Thailand came onstream in August 2015 and comprises a mobile offshore production unit (“MOPU”) and a floating storage and offloading (“FSO”) vessel.

KrisEnergy said Wednesday it had terminated the bareboat charter with Rubicon for the FSO vessel, and that it would move the MOPU from the offshore location.

"The company is in discussions regarding the warm-stacking of the MOPU with a skeleton crew and supported from the Songkhla shore base. Due to the suspension of Wassana production, the company will reduce its workforce in Thailand by approximately 25.0%," KrisEnergy said.

Operations at the Group’s remaining producing assets – the B8/32 oil and gas fields in the Gulf of Thailand and the Bangora gas field in Block 9, onshore Bangladesh – continue as usual, it added.

Categories: Energy Activity Production Asia Thailand

Related Stories

PTTEP, Petronas Ink 35-Year Malaysia-Thailand Gas Deals

Seatrium Nears Dual FPSO Sailaway for Petrobras' Búzios Field

BP Completes Central Azeri Platform Maintenance, Ramps Up Production

Iran Tightens Enforcement of Strait of Hormuz Transit Rules

ONGC Nears Venezuela Operatorship Deals, Regains Russia’s Sakhalin-1 Stake

Vantris Energy Secures Petronas’ Offshore Drilling Work Orders

ADNOC, SLB Roll Out AI Platform Across More Than 120 Drilling Rigs

India’s ONGC to Allocate Half of New Oil Storage to Strategic Reserves

Energean Lifts Karish Fields FPSO Oil Processing Capacity

EnQuest Clears Key Hurdle for $833M Malaysia Offshore Deal

Current News

Petronas Turns to AI to Accelerate Upstream Investment

PTTEP, Petronas Ink 35-Year Malaysia-Thailand Gas Deals

Iran Outlines Terms for Restoring Hormuz Shipping

Technip Energies Nets Engineering Services Job for ADNOC Offshore

Seatrium Nears Dual FPSO Sailaway for Petrobras' Búzios Field

Strait of Hormuz Shipping Marks Slight Rise

China's CNOOC Posts Record First-Half Profit

BP Completes Central Azeri Platform Maintenance, Ramps Up Production

Iran-Oman Talks on Hormuz Reopening Drive Down Oil Prices

Viridien Progresses Hybrid Multi-Client Survey Offshore Malaysia

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com