Two New Tugs Being Built for China Petroleum

MarineLink
Monday, June 1, 2020

Shipbuilder PT. Graha Trisaka Industri, in Batam, Indonesia is building a pair of new TRAktor V-3200 tugs for China Petroleum Corporation (CPC), of Taiwan.

The shipyard, with support from Robert Allan Ltd., was awarded the construction contract by CPC following an international bid process. A steel cutting ceremony was held for the newbuilds on April 15.

Upon delivery, the custom designed tugboats will operate at the CPC liquefied natural gas (LNG) terminal at Shenao in Taiwan.

The TRAktor V design by Robert Allan Ltd. applies to Voith-propelled tugs designed for harbor, offshore terminal, or tanker escort duties. The new tug is designed to comply with the Chinese Classification Society with the notation CR100+E Tug, Fire-Fighting Ship 1, Coastal Service CMS+.

Categories: Shipbuilding Workboats Vessels Coastal/Inland Tugs

Related Stories

Oil Stabilizes as IEA Moves to Speed Up Emergency Stock Releases

Yinson Production Raises $1.46B to Refinance Agogo FPSO

ADNOC Signs Multi-Year LNG Supply Deal with Thailand’s Gulf Group

Inpex Buys Into Two BP-Operated Indonesian Offshore Blocks

TGS to Reprocesses Seismic Data for Petronas’ Megah Discovery

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

Kazakhstan Resumes Action to Collect $5.2B Kashagan Field Fine

Seatrium Nears Dual FPSO Sailaway for Petrobras' Búzios Field

Mermaid Maritime Expands Into US Offshore Market

Current News

Valeura Starts Wassana Platform Installation Offshore Thailand

Oil Stabilizes as IEA Moves to Speed Up Emergency Stock Releases

Yinson Production Raises $1.46B to Refinance Agogo FPSO

Oil Climbs on US Storm Threat, Saudi Attack Risks

KBR to Support Aramco’s Marjan Offshore Field Upgrade

Oil Industry Braces for Years of Market Disruption

Eni Taps Yinson Production for Major Ghana FPSO Gas Upgrade

ADNOC Signs Multi-Year LNG Supply Deal with Thailand’s Gulf Group

Iran Set to Keep Hormuz Shut Until Seven Demands Are Met

LNG Flows Through Hormuz Hit Seven-Month High

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com