Brazil: FPSO Charter Ends 5 Years after Deadly Explosion

OE Staff
Monday, March 30, 2020

FPSO leasing company BW Offshore has informed that a charter for FPSO Cidade de Sao Mateus has expired. 

The FPSO was involved in an explosion in February 2015, an incident in which nine workers were killed, and 26 others injured. 

There were 74 people aboard the FPSO at the time of the incident which happened after an explosion in the pump room, which caused significant damage to the FPSO itself, too.

The unit at the time operated for at Petrobras' Camarupim and Camarupim Norte fields in Espirito Santo 120 km from the coast.

According to a report by the Brazilian Navy after the incident, the explosion caused severe structural damage at the aft section, it affected living
quarters, engine room, pump room and structural fittings and equipment located in those quarters.

While there have been scenarios were the FPSO would be repaired and eventually return to production at Petrobras' offshore oil fields, this never happened.

In a statement on Monday, March 30, 2020, BW Offshore, the owner of the FPSO said: "BW Offshore informs that the charter agreement and the services agreement for the FPSO Cidade de Sāo Mateus, which was operating on the Camarupim field offshore Brazil from 2009 until 2015, reached their final terms on March 29, 2020."

The FPSO is currently in lay-up in Singapore.

Categories: Vessels Activity FPSO Oil Production Gas Floating Production

Related Stories

Iran Tightens Enforcement of Strait of Hormuz Transit Rules

ADNOC, SLB Roll Out AI Platform Across More Than 120 Drilling Rigs

BP Moves Indonesia CCUS Project Into Offshore Installation Phase

ABL Gets Papua New Guinea FSO Job

Inpex Starts Construction of Indonesia's Abadi LNG Project

Hormuz Crossings Decline as US Renews Iran Blockade

Unity Enters Asia-Pacific Market with Malaysia P&A Work

Noble Gets $136M Brunei Drillship Job

MODEC Advances Construction of Brazil-Bound Gato do Mato FPSO

Floating Nuclear: A New Offshore Energy Frontier

Current News

China's CNOOC Posts Record First-Half Profit

BP Completes Central Azeri Platform Maintenance, Ramps Up Production

Iran-Oman Talks on Hormuz Reopening Drive Down Oil Prices

Viridien Progresses Hybrid Multi-Client Survey Offshore Malaysia

TGS Extends Work on Indonesia’s Largest Seismic Acquisition Project

Saudi Contractor Enters Oman with Four-Well Drilling Assignment

McDermott Gets ADNOC’s ‘Mega Contract’ to Advance Umm Shaif Field

Iran Tightens Enforcement of Strait of Hormuz Transit Rules

TenneT Completes Drilling, Installation of Protective Conduits for Wind Farms

ConocoPhillips, CNOOC Put Penglai Field off China Into Full Operation

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com