Santos Preps for Yoorn-1 Drilling

OE Staff
Thursday, March 12, 2020

Australian oil and gas operator Santos is planning to carry out an offshore survey in preparation for the proposed Yoorn-1 drilling in the offshore block WA-499-P, in W. Australia.

According to an application filed this week, as part of the drilling preparatory work, a vessel-based site survey will be carried out involving geophysical survey techniques to assess the shallow seabed soils suitability to provide a safe foundation for a jack-up drilling rig.

The survey activity, for which Santos on Tuesday filed an environment plan, will involve surveying the planned drilling location and tie-in lines extending from the proposed drilling location to existing data points in the nearby area.

The survey will be undertaken using multi-beam echo sounding (MBES) and side-scan sonar (SSS) data to define the bathymetry/seafloor morphology. 

Identification of any hazards that may impact the location of a jack-up rig through sub-bottom profiling (SBP) and grab sampling or drop cores for ground-truthing the surficial geophysics and support jack-up rig spud-can penetration assessments.

Water depth in the operational area ranges from approximately 40 m to 50 m. 

The activity will take place in 2020-2021. Allowing for potential downtime, for example, due to weather or vessel operability issues, the activity may extend to up to 10 days. Activities will be undertaken for up to 24 hours per day.

Categories: Energy Drilling Geoscience Subsea Australia/NZ Shallow Water Rig Seismic Survey

Related Stories

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

Fugro Adds More Survey Work off Timor-Leste

Valeura Finds New Oil Near Manora Field in Gulf of Thailand

Saudi Oil Lifeline Shut After Attack as Red Sea Threat Grows

Greater Sunrise Gas Production Pushed Back to 2034

Viridien Progresses Hybrid Multi-Client Survey Offshore Malaysia

Saudi Contractor Enters Oman with Four-Well Drilling Assignment

TenneT Completes Drilling, Installation of Protective Conduits for Wind Farms

Fugro Secures India Deepwater Drilling ROV Contract

Vantris Energy Secures Petronas’ Offshore Drilling Work Orders

Current News

Eni Taps Yinson Production for Major Ghana FPSO Gas Upgrade

ADNOC Signs Multi-Year LNG Supply Deal with Thailand’s Gulf Group

Iran Set to Keep Hormuz Shut Until Seven Demands Are Met

LNG Flows Through Hormuz Hit Seven-Month High

Inpex Buys Into Two BP-Operated Indonesian Offshore Blocks

TGS to Reprocesses Seismic Data for Petronas’ Megah Discovery

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

KKB Unit to Deliver Offshore Structures for Shell’s Malaysian Fields

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com