Massive TP's Shipped for Taiwan Windfarm

Posted by Michelle Howard
Tuesday, August 13, 2019

Jumbo reports completion of a shipment of the "heaviest, tallest and the largest diameter "Transition Pieces (TP’s) it has ever transported.

The TP’s were shipped for Jan De Nul Group in cooperation with brokers Multi Marine Chartering B.V. from Laem Chabang to Taichung, where they will form part of Taiwan’s Formosa 1 Phase 2 Offshore Wind Farm (OWF).

The Formosa 1 OWF will have a total capacity of 128MW once built and commissioned. Phase 1 of Formosa 1 features two Siemens 4MW demonstration turbines, the first ever wind turbines to be installed off Taiwan. The Formosa 1 Phase 2 is owned by Formosa I Wind Power Co. Ltd., a partnership of Ørsted (35%), JERA (32.5%), Macquarie Capital (25%), and Swancor Holding (7.5%).

In advance of the shipments, Jumbo coordinated the fabrication of 12 grillages which act as individual secure holdings on deck for each TP.  After installing the grillages onboard the Jumbo Kinetic, the vessel set sail to Laem Chabang to set the project in motion.

The TP’s were  secured to the grillages on board the Jumbo Kinetic by her specialized team and then moved in 3 shipments from Laem Chabang to Taichung. 

In total 20 TP’s with a diameter of 7.8 x 30 m high and a weight of 462 tonnes each were shipped.

Categories: Logistics Wind Power Offshore Energy Turbines Intermodal

Related Stories

Petrobras’ New FPSO Sets Sail From South Korea to Brazil's Santos Basin

Mooreast to Assess Feasibility of Floating Renewables Push in Timor-Leste

Sponsored: Record Deals and Record Attendance Underscore ADIPEC’s Global Impact

Sponsored: Energy and Finance Chiefs Call for Sound Policy, Stable Frameworks at ADIPEC

Sponsored: Energy Sector Urged to Scale AI Adoption at ADIPEC

PTTEP Orders OneSubsea Systems for Two Deepwater Projects off Malaysia

Pharos Energy Kicks Off Drilling Campaign Offshore Vietnam

Viridien to Shed More Light on Malaysia’s Offshore Oil and Gas Potential

Saipem Wins FEED Contract For Abadi LNG Project FPSO Module In Indonesia

Dutch Contractor Completes Malaysia’s Largest 'Rig-to-Reef' Decom Project

Current News

MODEC Forms Dedicated Mooring Solutions Unit

Seatrium Maintains $12.8B Order Book on Renewables and FPSO Progress

Petrobras’ New FPSO Sets Sail From South Korea to Brazil's Santos Basin

Eneos Warns on Skyrocketing Costs fo Offshore Wind

Mooreast to Assess Feasibility of Floating Renewables Push in Timor-Leste

Malaysia Issues First Offshore CCS Permit to Petronas Subsidiary

Sponsored: Record Deals and Record Attendance Underscore ADIPEC’s Global Impact

Sponsored: Energy and Finance Chiefs Call for Sound Policy, Stable Frameworks at ADIPEC

Sponsored: Energy Sector Urged to Scale AI Adoption at ADIPEC

Sponsored: Policy, AI, and Capital Take Center Stage at ADIPEC 2025

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com