Total Launches New Supercomputer

By Bate Felix
Tuesday, June 18, 2019

Energy major Total said its new supercomputer - which has propelled it to a world ranking as the most powerful computer in the sector - will enable its geologists to find oil faster, cheaper and with a better success rate.

The Pangea III computer build by IBM will help process complex seismic data in the search for hydrocarbons 10 times faster that before, Total said on Tuesday.

The computing power of the company has been increased to 31.7 so-called 'petaflops' from 6.7 petaflops in 2016, and from 2.3 petaflops in 2013, Total said, adding that it was the equivalent of around 170,000 laptops combined.

Petaflops is a measurement of computing power.

The computer ranks as number 1 among supercomputers in the oil and gas sector, and number 11 globally, according to the TOP500 table which ranks supercomputers twice a year.

Total's European peer Eni's HPC4 supercomputer is ranked number 17 in the global top 500 list.

Oil and gas companies, along with other industrial groups, are increasingly relying on powerful computers to process complex data faster. This enables them to cut costs while boosting productivity and the success rate of projects.

Total did not say how much it had invested in the new supercomputer.

The company's senior vice president for exploration, Kevin McLachlan, told Reuters that 80% of the Pangea III's time would be dedicated to seismic imaging.

"We can do things much faster," he said. "We are developing advanced imaging algorithms to give us much better images of the sub-surface in these complex domains and Pangea III will let us do it 10 times faster than we could before."

Total said the new algorithms can process huge amounts of data more accurately, and at a higher resolution.

It would also help to locate more reliably hydrocarbons below ground, which is useful in complex environments where it is exploring for oil trapped under salt, such as Brazil, the Gulf of Mexico, Angola and the Eastern Mediterranean.

McLachlan expected the increased computer power to affect Total's success rate in exploration, because of the better imaging, and in oil well appraisals, development and drilling.

"What used to take a week, now takes us a day to process," he said, adding that tens of millions of dollars of savings would be made on the oil wells as a direct result of obtaining better images.


(Reporting by Bate Felix; Editing by Sudip Kar-Gupta and David Evans)

Categories: Software Technology Drilling

Related Stories

Energean Lifts Karish Fields FPSO Oil Processing Capacity

Velesto Frees Up Drilling Rig After Early Contract Termination off Indonesia

Jadestone Energy Lifts Malaysia Production with Second Online Well

Noble Gets $136M Brunei Drillship Job

From Fixtures to Values: Where the Jackup Recovery Is Already Being Priced

SBM Offshore, SWS Sign Deal for Seventh FPSO Hull

Walking Into the Future: ADNOC Drilling Unveils First AI-Powered Island Rig

Jadestone Brings First Malaysia Campaign Well Online at 3,000 bpd

Valeura Concludes Nong Yao Drilling Ops, Boosts Gulf of Thailand Production

Velesto’s Jack-Up Rig Up for Gulf of Thailand Drilling Campaign

Current News

Oil Eases After Topping $100, Still Set for Weekly Rise

BP Moves Indonesia CCUS Project Into Offshore Installation Phase

Eni-Petronas JV Starts Indonesia-Bound FPSO Construction

QatarEnergy Prolongs LNG Force Majeure, Charters Out Tankers

Chevron Enlists Velesto’s Jack-Up Rig for Drilling Job off Malaysia

ABL Gets Papua New Guinea FSO Job

Energean Lifts Karish Fields FPSO Oil Processing Capacity

Oil Rises on Dual Shipping Threat in Hormuz and Red Sea

ADNOC Approves $6.2B Offshore Umm Shaif Gas Project

Velesto Frees Up Drilling Rig After Early Contract Termination off Indonesia

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com