EuroAsia Still on PCI List

Laxman Pai
Thursday, June 13, 2019

The EuroAsia Interconnector, the Israel-Cyprus-Greece electricity link remains on the official list of European projects of common interest (PCI) making it eligible to receive some €300 mln in EU grants for the Crete-Attica sector of the cable.

The EuroAsia Interconnector remains committed to the timely implementation of the project, as submitted to the European Commission, with the Crete-Attica interconnector commissioned in June 2022 and the Crete-Cyprus Interconnector in December 2023, ending the energy isolation of Crete, and Cyprus, the last EU member state not interconnected to the European electricity grid.

The European Commission’s Enhanced Surveillance Report for Greece (June 2019) specific reference to the EuroAsia Interconnector: “Whilst the progress made with the implementation of Crete’s interconnection to the Peloponnese is positive news, the uncertainty about the status of the Attica-Crete interconnection continued."

The overall project, linking Attica, Crete, Cyprus and Israel, remains on the list of Projects of Common Interest (PCI) for now; thus being eligible for EU funding (approximately EUR 300 million to be allocated to this project), until the formal adoption of the 4th PCI list, it pointed out.

However, the electricity transmission operator (ADMIE) decided to start implementing the Attica-Crete segment as a national competitive project and Greece did not support the inclusion of the project in the 4th PCI list, therefore rendering it ineligible for grants under the Connecting Europe Facility.

"Continued support by the authorities of the PCI status of the project beyond 2019 could allow taking full advantage of the benefits deriving from the TEN-E Regulation, such as eligibility for applying for grants under the Connecting Europe Facility," it said.

Categories: Energy Offshore Energy Subsea Cables Cabling Connectivity

Related Stories

Inpex Moves to Accelerate Indonesia’s Abadi LNG Project

Chevron in Final Talks with Eneos, Glencore on Singapore Assets Sale

Samos Energy Buys Suksan Salamander FSO from Altera Infrastructure

Thailand's Gulf Energy Eyes Long-Term LNG Supply

Offshore Rig Outlook: As 2025 Challenges Fade, Path Ahead Brightens

Low Demand, High Supply Keeps Asia LNG Spot Prices Flat

Sponsored: Energy Sector Urged to Scale AI Adoption at ADIPEC

How Hot Is Your Cable? Understanding Subsea Cable Thermal Performance

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

MDL Secures Cable Laying Job in Asia Pacific

Current News

Australia and Timor-Leste Push to Advance Greater Sunrise Gas Field

MODEC, Eld Energy Partnership Targets Low-Carbon FPSO Power

JERA Lifts First LNG Cargo From Barossa Gas Project in Australia

Inpex Moves to Accelerate Indonesia’s Abadi LNG Project

Chevron in Final Talks with Eneos, Glencore on Singapore Assets Sale

Seadrill Firms Up Offshore Drilling Workload with Multi-Region Contract Awards

Turkish Petroleum, Chevron Discuss Joint Oil and Gas Exploration

ADNOC Gas Signs $3B LNG Supply Deal with India’s HPCL

Samos Energy Buys Suksan Salamander FSO from Altera Infrastructure

Philippines Makes First Offshore Gas Discovery in Over a Decade

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com