Saudi Aramco Lauches Arabian Rig Manufacturing

Laxman Pai
Tuesday, February 19, 2019

Saudi Aramco and National Oilwell Varco Incorporated (NOV) recently held the first Arabian Rig Manufacturing (ARM) Board of Managers meeting.

ARM is a newly formed company, a joint venture (JV) between NOV (owning 70% of the JV’s shares) and Saudi Aramco. Highlights of the meeting included the appointment of senior officials and the approval of the company’s branding strategy.

The JV partnership will establish a world-class onshore rig and equipment manufacturing and aftermarket facility in Ras al-Khair, 80 kilometers north of Jubail. The modern, integrated facility will have the capacity to produce 10 rigs per year to serve the Middle East and North Africa region.

Spanning over 500,000 square meters, ARM will be the single largest state-of-the-art rig, drilling equipment, and aftermarket facility to date.

The complex will complement engineering, training, service, and repair capabilities, with additional cross-functional efficiency and design flexibility to address market requirements and technological advancements.

The fully integrated manufacturing and services hub includes a two-floor office block, warehouse, raw material laydown yard, fabrication shop, machine and assembly shop, total paint and blast, rig-up yard, repair shop, and a future expansion area.

With a commitment to Saudization, it is estimated that the facility will create local employment for 1,100 people in multiple disciplines and across various levels of expertise. Additionally, it will contain a world-class training center installed with the latest equipment and simulators to provide the required training.

ARM will be supported by a commitment from the recently announced Saudi Aramco Nabors Drilling Company to buy drilling rigs from the JV.

Construction work will be completed in two years. Commissioning of the facility is expected by 2020, with the first rig to be delivered by 2021. By 2025, it’s expected ARM will have manufactured 55 land rigs, and contributed significantly to Saudization and the creation of local content.

Categories: Marine Equipment Construction and Design Rig

Related Stories

Oil Falls as Supply Glut Concerns Overshadow Hormuz Shipping Risks

Masirah Oil Delays Yumna Production as Drilling Progresses off Oman

Shell Brings Deepwater Gas Fields Onstream off Malaysia

Inpex Raises Profit Forecast on Strong Ichthys LNG Production

Singapore Seeks LNG Floating Storage Operators to Expand Bunkering Ops

First Oil Flows from Vietsovpetro's Platform Offshore Vietnam

VAALCO Advances Côte d'Ivoire Offshore Exploration Ahead of 2028 Drilling

ADES Lands $117M ONGC Drilling Contracts for Two Jack-Ups

Aker Solutions Lands Major Role in Qatar’s Offshore Oil Field Revamp

Seatrium Inks $390M Deal to Complete Four Offshore Rigs for Keppel’s Rigco

Current News

Petronas Names ‘World's First’ Nearshore FLNG Facility

Oil Falls as Supply Glut Concerns Overshadow Hormuz Shipping Risks

Masirah Oil Delays Yumna Production as Drilling Progresses off Oman

Searah Starts Production from New Bukit Tua Well Offshore Indonesia

NMDC Energy to Acquire Wasco’s Engineering Division for $190M

China’s COOEC Lands $800M QatarEnergy Subsea Contract

Oil Prices Rise as Houthi Strikes Revive Supply Disruption Fears

COSL Places $1.64B Order for 59 Offshore Support Vessels

When Contractors Collide: Keeping Offshore Energy Projects on Schedule

Floating Production Outlook: Pipeline Looks Huge, But Not All Projects Are Created Equal

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com